Laserfiche WebLink
Maa 19 03 03:06p Kosnik En�ineerin� f4251 743-iB4B p.l <br />,� �lCIDSNIK ;, M <br />+�. BeIGINEERING FAXMEMORANDU <br />A'I'fN: Jce GafT'ney <br />COMPANY: Gaffaey Construction <br />FAX: <br />CC: Angela Russ-GPA <br />DA1'E: <br />PROJECT: <br />KE JOB NO. <br />PAGFS: <br />Hnrd Copy to Follow via Mail: Yes ❑ No � <br />5-19-03 <br />Sunrise <br />03-018 <br />1 of 1 <br />Re: ModiBcaHo�e to the Esietine 7 x 13 GLB SupportfnQ the East Mrv,�nine o[t6e BuLding <br />The bottom of the beam projects bebw the hoader as Door 110A. A post will be acided below the beam <br />at the south side of the door and the north eide of tLe :e-fight adjaceat to the door. 3-1/2 imhes will be <br />\ cut from the bottom of the existing beam in onder to eliminate the header conflict. <br />1 <br />I reviewed this approach with Jce on s"rte ancl found it to be swcturally acceptable. <br />� <br />Principnl - <br />Kosn�c En�ineerin� <br />/ <br />.. \, <br />.. <br />il�•L's ` Fhone: (425)743-7004 ra�c: (42�' <br />y � � 16300 Mill GYeek Blvd., Suite 105 <br />'� Mill (.`roek. WA 98012 <br />