My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quality Controls Corporation 2/10/2020
>
Contracts
>
6 Years Then Destroy
>
2020
>
Quality Controls Corporation 2/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 9:56:57 AM
Creation date
2/13/2020 9:47:43 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quality Controls Corporation
Approval Date
2/10/2020
End Date
12/21/2021
Department
Public Works
Department Project Manager
Rick Bailey
Subject / Project Title
Integrate Equipment WFP Process Pump Station
Tracking Number
0002230
Total Compensation
$42,355.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pricing <br /> QCC provides the following services as described in the Scope of Work Below <br /> Item 1: Process Water Pump Station improvements: $ 11,355.00 <br /> Item 2: Plant SCADA system evaluation and improvements: <br /> Hourly Services on demand- budget 200 hrs @ $155/hr $ 31,000.00 <br /> Clarifications and Exclusions <br /> 1. QCC provides professional and field services only under this scope of work. QCC's prices does <br /> NOT include any new hardware or software license. It is assumed all required hardware and <br /> software licensing is existing and in good working order. Any required hardware, equipment, or <br /> license identified as necessary will be quoted under a separate cover. <br /> 2. QCC does NOT provide the following unless specifically included in our bill of material: <br /> • Pipe, tubing, valves or fittings between the instrument and the process. <br /> • Conduit, wire or cable not integral to instrument or control panels supplied by QCC. <br /> • Mounting brackets, stanchions, supports or mounting pads not an integral part of the <br /> instrument. <br /> • Labor to install the equipment. <br /> • The Cost, (if due to local union regulations), to have local craftsman make <br /> adjustments or wiring modifications to our equipment during start-up and <br /> calibration. <br /> • Any material or services not in our quoted sections. <br /> Scope of Work <br /> Item #1- QCC provides the following services: <br /> 1. Control Systems Engineering— <br /> a. QCC reviews and evaluate the existing Process Water Pump Station MCC and VFD as- <br /> built documentation and provides red-lined modifications as required to meet the <br /> functional requirements of the specifications and recommended industry best <br /> practices for industrial control systems. Includes confirming and/or corrections for <br /> operation in full auto PLC control, manual local control, restart after powerfail /fault, <br /> and other standard control parameters for critical process systems <br /> 2. Field Service Technician- <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.