My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/07/02 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/07/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 10:21:52 AM
Creation date
2/13/2020 10:18:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/2/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> t 9 <br /> EXHIBIT A <br /> Scope of Work <br /> May 23, 2014 <br /> EVERETT RIVERFRONT DEVELOPMENT <br /> PROJECT GROUP 3 PUBLIC AMENITIES <br /> AMENDMENT#11 <br /> PROJECT DESCRIPTION <br /> During the term of this AGREEMENT, the CONSULTANT (MacLeod Reckord) and identified <br /> SUBCONSULTANTS shall perform professional services in connection with the following project: <br /> Everett Riverfront Development <br /> Project Group 3 Public Amenities <br /> Scope of Services <br /> MacLeod Reckord will provide a range of general engineering and management consulting (GEC) <br /> services and technical expertise in all phases of the delivery of the following tasks related to the <br /> Riverfront Development Project Group 3 Public Amenities: <br /> Task 000 GEC Management <br /> 001 Site Analysis and Reporting <br /> 002 Coordination Meetings, City Team Meetings, Grant Application Support <br /> 003 (Not Used) <br /> 004 (Not Used) <br /> 005 Permit Application and Coordination <br /> 006 Wetland and Habitat Enhancement <br /> 007 (Not Used) <br /> 008 (Not Used) <br /> 009 (Not Used) <br /> 010 Contingency and Misc. Projects/Tasks <br /> 011 (Not Used) <br /> 012 (Not Used) <br /> 013 Construction Support Services <br /> The work to be performed includes, but is not limited to wetland, stream, and shoreline <br /> enhancement planning and design; permit coordination and application; and environmental <br /> analysis, engineering, mapping, and reporting to support the work. <br /> Specific work within this amendment includes: <br /> • 90%/100% PS&E for North Wetland Complex/Wetland C/Walton Creek Enhancements <br /> (NWC). <br /> • Permit application and supporting documentation for NWC. <br /> • Construction administration services for finalizing Interim Railroad Corridor Trail and <br /> Enhanced Drainage Swale project. <br /> 1 <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.