Laserfiche WebLink
1 " <br /> projects from the Riverfront Development plan will be incorporated into this permit <br /> application. <br /> 2. The Consultant has provided initial permit application to the CITY and following CITY <br /> review, has submitted the 60% design package, JARPA, JARPA Exhibits,Wetland Report,. <br /> Wetland Memorandum, NWC Design Memorandum, Declaration of Restrictive Covenants, <br /> Cultural Resources Memoradum, Archaeological Site Form, FEIS Addendum, and NWC <br /> Biological Assessment Draft to USACE, DNR, DOE, and WDFW for review. Follow up <br /> submittals to the CITY and permit review agencies will be managed similarly,with the CITY <br /> taking the lead in submittal to and coordination with the agencies. <br /> 3. The CITY and/or developer will provide stormwater design plans and technical reports for <br /> the residential and commercial developments for analysis of stormwater issues required for <br /> finalization of the BA. <br /> 4. The CITY will provide copies of technical documents not described herein needed to support <br /> the permit application, including revised agreements, SEPA addendum, or others. <br /> DESIGN STANDARDSICRITERIA <br /> 1. City of Everett drawing standards, ACAD 2014, Civil 3D 2014, or as agreed. <br /> 2. Specification format for 90% and 100%submittal is WSDOT Standard Specifications. <br /> Special Provisions prepared by the design team; Amendments and General Special <br /> Provisions prepared by the design team with input from the CITY. <br /> 3. City of Everett, Design and Construction Standards and Specifications for Development, <br /> current edition. <br /> 4. City of Everett, Stormwater Management Manual, current edition. <br /> 5. City of Everett, Water and Sewer Design Standards, current edition. <br /> 6. WADOE, 2005 Stormwater Management Manual for Western Washington. <br /> 7. WSDOT, Standard Specifications for Road, Bridge, and Municipal Construction, English, <br /> current edition and Amendments. <br /> SCHEDULE <br /> The scope of work is premised on a Notice-to-Proceed date of July 1, 2014. Schedule for <br /> completion of individual work tasks will be coordinated with milestones for completion of CITY and <br /> Developer tasks. <br /> Tentative schedule as follows(permit review/comment schedule dependant}: <br /> • 90% PS&E completion November 2014. <br /> • 100% PS&E completion February 2015. <br /> • Construction for NWC is anticipated to be July-September 2015, and is not included in the <br /> scope or fee at this time. <br /> • Construction support for completion of Railroad Corridor Trail and Enhanced Drainage <br /> Channel may extend into 2015, and this scope includes minimal construction support <br /> services for this project. <br /> DELIVERABLES <br /> Deliverables will be provided as noted herein and as described in detail in individual Task Order <br /> Documents. <br /> TASKS <br /> 000. GEC Management <br /> 3 <br /> 11 <br />