Laserfiche WebLink
� 1 <br /> � II Geotechnical Gnbineering I:ecommendatia�s <br /> 6.0 Introduction <br /> � Based on the findings of our study, it is our opinion, from a geotechnical s?andpoint, that the subject <br /> propeny is suitabie for the proposed development, provided the recommendations pro�✓ided herein <br /> � are properly followed. The dense native sediments, or properly placed structural fill placed on the <br /> native sediments will be capable of providing suitable foundation support for the proposed structures <br /> utilizing conventional spread footing foundations. One area(around EP-6) where unsuitably soft <br />�I � silt was encountered, will require overezcavation to reach a suitable bearin� stratum. Slab on grade <br /> floors may also be supported on thc natural bearing sediments or structural fill. <br /> � 7.0 Site Preparation ' <br /> Old foundations presently on site should be completely temoved. Any buried utilities should also <br /> � be removed or relocated if they are under building areas. R.es!ilting depmssions should be brought <br /> back to grade with structural fill (Section 8.0) <br /> � Site preparation of[he planred building and road/parking areas should include removal of all trees, <br /> brush, debris and any deleterious material. Additionally, tl�e upper organic ropsoil should be <br /> � sfipped and remaining roots grubbed. Based on our exploration pits, topsoil s'sipping depth should <br /> be from two to hvelve inches. Existing asphalt should be removed and disposed of off site in <br /> accordance �vith local regulations. The entire site should the� be rolled to compact any toose or <br /> disturbed soils. Finally, :lie site should be proof rolled with a heavy, fully loaded dump truck to <br /> � delineate any soft areas susceptibfe to settlement. Proof rolling should be wimessed by our soils <br /> engineer. Soft or loose areas evident during proof rolling should be excavated to frm soils and <br /> � replaced�vith structural fill (Section 3.0). <br /> [f gading takes place during the wet winter months, exposed subgrade soils should be protected witl-, <br /> � a layer of clean sand and gravel, (ean concrete, or asphalt-treated base. Should subgrade soils <br /> become excessively wet or disturbed, they should be'removed and replaced with compacted <br /> structural fill containing less than five percent (5%) fines. Where underlying soils are escessively <br /> iwet, it may be necessary to stabilize the irea with a layer of quarry spalls or a layer of geotexti(e <br /> - fabric (such as Mirafi �OOx) between tne subgrade and structural fill. Wet surficial soils were <br />� encountered near the pond at the south end of proposed building C and will require such <br /> stabilization. <br /> � In our opinion, stabie construction slopes should be the responsibility of the contractor and should <br /> be determined during construction. For estimating purposes,however,we anticipate that temporary, i <br /> � unsupported cut slopes in the dense glacial till can be made at a maximum slope of O.�H:1 V �I <br /> � (Horizontal:Vertical). Temporary cut slopes in topsoil and sands and gravel should be sloped back <br /> to 1 H:1 V. As is typical with earthwork operations, some sloughing and raveling may occur and cut <br /> slopes may have to be adjusted in the 6eld. In addition, WISHA/OSHA regulations should be <br /> � followed at all times. <br /> � �b <br /> ' MAYES TESTING ENGINEERS <br />