Laserfiche WebLink
,� ( <br /> � 8.0 Structural Fiil <br /> � Only rough grading plans were aclilable at the time of this rcport. We understand that the finished <br /> floor elevations will Uc approximately as sho�vn on the site plan given us and therefore, on site or <br /> � possibly imported fill will be required. All references to structural fill in this report refer to subgrade <br /> preparation, utility backfill, fill type, placement, and compaction oi materials as discussed in this <br /> section. After the soil has b�en excavated, the upper 12 inches of exposed ground to receive <br /> � structural fill should be recompacted to a mi:�imum of 90% of the modified Proctor m�imum <br /> density using ASTM:D I�57 as the standard. If the subgrade contains too much moisture, adequate <br /> I � recompaction may be difficult or impossi�'te to obtain and sliould probably not be attempted. In lieu <br /> of recompaction, the area to receive F.il should be blanketed with washed rock or quarry spalls to act <br /> as a capillary break between the new fill and the wet subgrade. <br /> � After recompaction of the exposed ground is tested and approved, or a free-draining rock course is <br /> laid, structural fill may be placeci to attain desired grades. Structural fill is defined as non-organic <br /> � soil, acceptable to the geotechnical engineer, placed in 8 inch loo�e lifts with each lift being <br /> compacted to 95%of the modiEed Proctor maximum dry density(ASTM:DI�57). Therefore, during <br /> overexcava[ion and replacement, the stockpiles should be protected so that the soil remains close to <br /> � its existing moisture content. <br /> Soils in which the amount of fine-erained material (sr,ialle: than No. 200 sieve) is greater than ' <br /> � approximately 5% (measured on the minus No. 4 sieve size) should be considered moisture- <br /> seusitive. Use of moisture-sensitive soil in the structural fill sY.ouid be limited ro favorable dry <br /> weather conditions. Consequently, if earfhwork operations will occur during the wetter times of the <br /> � year, a clean, &ee-draining gravel and/or sand should be used. Free-draining fiil consists of nen- ' <br /> organic soil with the amount of fine-grained matetial limited to 5% by weight when measured on !i <br /> � the minus No. 4 sieve &action. Most ot"the onsite soils are not considered to be free draining. <br /> � <br /> The top of the compacted fill should extend horizontally outward a minimum distance of at least 3 <br /> � feet beyond the location of their perimr.ter footings or pavement edge before sloping down at a <br /> ma�imum angle of 2H: i V (Horizontal: Vertical). <br /> ' The contractor should note that any proposed fill soils must be eva!uated by a representative of our <br /> . firm prior to their use in structural tills. This would required that w�e have a sample of the material <br /> 48 Itouse in advance [o perform a Proctor test and determine its field compac,ion standard. <br /> , A representative from our firm shculd inspect the stripped subgrade and be present on z full-time <br /> b�uis during placement of structural fill to observe the wurk and perfortn a representative number <br /> � of in-place density tests. In this way the adequacy of the earthwork may be evaivated. As filling <br /> -� progresses, any prcUlem areas may Ue corrected at tha[time. It is important to understand [hat taking <br /> � random compaction tests on a part-time basis will noi assure unifoanity or acceptable performance <br /> ofa fill. <br /> ' <br />� S� <br /> ,� <br />' MAYES TESTING ENGINE�RS <br />