Laserfiche WebLink
Permit#: B1805-019 <br /> Site Address: 3202 20TH ST <br /> Owner: STATE OF WASHINGTON DEPT OF TRANS <br /> Tenant: VERIZON. <br /> App.Date: 5/11/2018 <br /> Proposed Use: COMMERCIAL <br /> yerizon,t <br /> Description: REMOVE 3 INSTALL6 PANEL ANTENNA'S <br /> APPROVE MUNITY <br /> NN�NG&COM DEPT Reviewed By: Date:<� J J l� <br /> PLA ANT l <br /> pEV OPM�` ,� Office Set Job Site et Fire/Planning Set <br /> BY �Y'\`I' <br /> DATE—- <br /> SEA GARFIELD _ 4 Rx 16. <br /> PROPRIETARY INFORMATION <br /> THE INFORMATION CONTAINED IN THIS SET OF -757,0-L-757,0-LCITY OF EVERETT T <br /> ANY USE OR <br /> ON DOCUMENTS IS PROPRIETARY THAT BY NATURE. 3209.20TH ST <br /> ANY USE OR DISCLOSURE OTHER THAN THAT WHICH <br /> RELATES TO VERIZON WIRELESS SERVICES IS STRICTLY EVERETT, WA, 98201 REVIEWED FOR PERMIT <br /> PROHIBITED. <br /> PROJECT CONTACT LIST DRAWING INDEX <br /> WhichP "'°se "�"xrQ APPLICANT: PROPERTY OWNER: DWG NO. DESCRIPTION <br /> T-1.0 TITLE SHEET <br /> VERIZON WIRELESS WASHINGTON STATE DEPARTMENT <br /> W3245 158TH AVENUE SE OF TRANSPORTATION G-1.0 GENERAL NOTES 1 <br /> PROJECT N a BELLEVUE,WA 98008 P.O.BOX 330310 A-1.0 SITE PLAN <br /> Surveying <br /> L D C I Engineering <br /> n e F^ SEATTLE,WA 98133 A-2.0 ENLARGED SITE P 'N Engi <br /> v PROJECT ARCHITECT: A-3.0 ELEVATIONS PlanningLDC,INC. PROJECT CONSULTANT: A-4.0 CONSTRUC •N DETAILS <br /> Mid Creek CONTACT:RICHARD B.HALL,AIA LDC,INC. A-5.0 CONSTR -TION DETAILS 20210142nd Avenue NE Ph.425.806.1869 <br /> PHONE:(425)806-1869 CONTACT:RICK CARDOZA ANTE A CONFIGURATION Woodinville,WA 98072 Fz.425.182.2893 <br /> r n oa EMAIL:rhall@Idccorp.com PHONE: (253)218-9017 RF-2.0 AN 'NNA CONFIGURATION DIAGRAM www.LOCco,p.con <br /> Ma ue p EMAIL: rcardoza@Idccorp.com <br /> Terrace k. E-1.0 HEMATIC GROUNDING PLAN DATE: 2-28-19 <br /> Botha - PROJECT E-z.o GROUNDING DETAILS DRAWN BY: KTL <br /> PSI9M S,TI„ Zor''Z' - Garage Lake arac CHECKED BY: RBH <br /> a t <br /> r " SUBMITTALS <br /> ®Red,, THESE DOCUMENTS HAVE NOT BEEN <br /> REV DATE DESCRIPTION BY <br /> = APPROVED FOR THE ISSUANCE OF <br /> T 1 2-28.18 PRELIMINARY CONSTRUCTION KTL <br /> Seattle B ios'GN PUBLIC WORKS, MECHANICAL, FIRE 2 4-1-19 FINAL CONSTRUCTION AAL <br /> SUPPRESSION, ELECTRICAL OR <br /> ' PLUMBING PERMITS. LEGAL DESCRIPTION <br /> ,, o ST NICHOLAS ADD BLK 411 D-00-LOTS 1 TO 16 INC <br /> l <br /> VICINITY MAP GENERAL LOCATION MAP 8828 REGISTERED <br /> 8 NOT TO SCALE NOT TO SCALE ARCHITECT <br /> DRIVING DIRECTIONS PROJECT INFORMATION UTILITY COMPANIES • �• <br /> FROM VERIZON WIRELESS OFFICE: NICHAR• -. ALL <br /> CODE INFORMATION: POWER: TELEPHONE: STATE OF WASHINGTON I <br /> • GET ON 1-90 W FROM SE EASTGATE WAY • MERGE ONTO 1-405 N ZONING CLASSIFICATION: R-2(RESIDENTIAL) SEATTLE CITY LIGHT TBD ExPIRESt 8-20-19 i <br /> • HEAD EAST TOWARD 158TH AVE SE • TAKE THE INTERSTATE 5 N EXIT TOWARD VANCOUVER BC BUILDING CODE: IBC 2015 PHONE:(206)684-300 <br /> • TURN RIGHT ONTO 158TH AVE SE • MERGE ONTO I-5 N CONSTRUCTION TYPE: IIB <br /> F. • TURN RIGHT ONTO SE EASTGATE WAY • TAKE EXIT 195 FOR MARINE VIEW DRIVE OCCUPANCY: U,S-2 APPROVAL STAMPJURISDICTION: CITY OF EVERETT <br /> 6 • TURN LEFT ONTO THE 1-90 W RAMP TO SEATTLE • TAKE SUMMIT AVE TO 20TH ST <br /> c • KEEP LEFT,FOLLOW SIGNS FOR 1-90 W/SEATTLE AND MERGE • TURN LEFT ONTO E MARINE VIEW DR PROPOSED BUILDING USE: UNMANNED TEL 'OM <br /> ONTO I-90 W • TURN LEFT ONTO SUMMIT AVE SITE LOCATION(NAD83): <br /> °, • FOLLOW 1-405 N AND 1-5 N TO E MARINE VIEW DR IN EVERETT. • TURN RIGHT ONTO 20TH STPROJECT DESCRIPTION j l // <br /> TAKE EXIT 195 FROM 1-5 N • DESTINATION WILL BE ON THE LEFT LATITUDE: 47°59'24.19" (47.990053°N) t/ <br /> • MERGE ONTO I-90 W LONGITUDE: 122°11'15.51" ' (122.187642°W) VERIZON WIRELESS PROPOSES TO MODIFY AN EXISTING <br /> • TAKE EXIT 10 FOR INTERSTATE 405 N TOP OF STRUCTURE: 229.00'±AM'.L 150.0'AGL UNMANNED TELECOMMUNICATIONS FACILITY WITH: <br /> BASE OF STRUCTURE: 79.00'±AM•L 0.0'AGL <br /> REPLACEMENT OF: <br /> o PROJECT LEASE AREA: PARCEL NUMBER: • (6)PANEL ANTENNAS SITE <br /> N/A 00563241100100 • (3)RRUS UNITS @ ANTENNAS -. <br /> NEW IMPERVIOUS AREA: AREA OF PARCEL: (1)PLATFORM ANTENNA MOUNT T19 601 <br /> APPROVAL/SIGN OFF 0 SF 1.14 ACRES ADDITION OF: SEA GARFIELD-4 RX <br /> DISCLAIMERS <br /> APPROVED BY DATE SIGNATURE DO NOT SCALE DRAWINGS.CONTRACTOR MUST VERIFY • (3)RRUS UNITS @ANTENNAS 3200 20TH ST <br /> ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY GENERAL INFORMATION: • (1)OVP DISTRIBUTION BOXES(1 @ ANTENNAS) EVERETT,WA,98201 <br /> SITE ACQUISITION ERRORS AND OMISSIONS.ALL PREVIOUS ISSUES OF THIS 1. PARKING REQUIREMENTS ARE UNCHANGED. • (1)HYBRID CABLE <br /> 2. TRAFFIC IS UNAFFECTED. <br /> ZONING DRAWINGS ARE SUPERSEDED BY THE LATEST REVISION. <br /> 3. SIGNAGE IS UNAFFECTED. REMOVAL OF: SHEET TITLE <br /> RF • (3)PANEL ANTENNAS TITLE SHEET <br /> CONSTRUCTION MANAGER LDC TAKES NO RESPONSIBILITY FOR ADEQUACY OF • (24)DIPLEXERS(18 @ ANTENNAS,6 @ EQUIPMENT) <br /> TOWER MOUNTS FOR EXISTING OR PROPOSED LOADING. UNITS @EQUIPMENT <br /> • <br /> PROJECT MANAGER CONTRACTOR AND MOUNT MANUFACTURER TAKE FULL (6)RUL• (6)RRUS UNITS @EQQIPMNT <br /> i LANDLORD RESPONSIBILITY FOR MOUNTING PRODUCTS USED& SHEET NUMBER <br /> THEIR ADEQUACY.MOUNTS SHOWN IN DRAWINGS ARE <br /> REVIEWERS SHALL CLEARLY PLACE INITIALS ADJACENT TO FOR ILLUSTRATIVE PURPOSES ONLY. T- •O <br /> o EACH REDLINE NOTE AS DRAWINGS ARE BEING REVIEWED 1 <br />