Laserfiche WebLink
GENERAL NOTES: ABBREVIATIONS: <br /> 1. THE PROPOSED INSTALLATION WILL BE UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR AFF ABOVE FINISHED FLOOR JT JOINT <br /> SEWER SERVICE. AFG ABOVE FINISHED GRADE LAM LAMINATED <br /> AFS ABOVE FINISHED SLAB LF LINEAL FOOT <br /> 2. THE PROPOSED INSTALLATION IS UNMANNED AND IS NOT FOR HUMAN HABITATION(NO HANDICAP ALUM ALUMINUM MANUF MANUFACTURER <br /> ACCESS IS REQUIRED) AB ANCHOR BOLT MAX MAXIMUM <br /> L ANGLE MECH MECHANICAL <br /> 3. OCCUPANCY IS LIMITED TO PERIODIC MAINTENANCE AND INSPECTION,APPROXIMATELY 2 TIMES PER ARCH ARCHITECTURAL MH MANHOLE <br /> MONTH,BY VERIZON TECHNICIANS. BTS BASE TRANSMISSION SYSTEM MM MILLIMETER <br /> BLDG BUILDING MIN MINIMUM <br /> 4. NO NOISE,SMOKE,DUST OR ODOR WILL RESULT FROM THIS PROPOSAL. BM BEAM MISC MISCELLANEOUS O <br /> BOT BOTTOM MPH MILES PER HOUR <br /> 5. OUTDOOR STORAGE AND SOLID WASTE CONTAINERS ARE NOT PROPOSED. B.O. BOTTOM OF MTL METAL <br /> • <br /> BOC BOTTOM OF CONCRETE NIC NOT IN CONTRACT 0 <br /> 6. ALL REFERENCES TO SPECIFIC STANDARDS FOR THIS PROPOSAL ARE UNDERSTOOD TO BE THE LATEST BOS BOTTOM OF STEEL NOM NOMINAL <br /> VERSION. CJ CONTROL JOINT NTS NOT TO SCALE <br /> Q CENTER LINE OC ON CENTER <br /> 7. THE TENDERED MUST UNDERGO A SITE VISIT TO CAREFULLY EXAMINE AND UNDERSTAND THE SCOPE OF CLG CEILING OD OUTSIDE DIAMETER I <br /> THE WORK REQUIRED BEFORE BID SUBMISSION.NO COMPENSATION IN ANY FORM WILL BE PAID FOR CLR CLEAR OH OVERHEAD <br /> EXPENSES RESULTING FROM FAILURE TO DO SO. CMU CONCRETE MASONRY UNIT OPNG OPENING <br /> COL COLUMN OPP OPPOSITE <br /> 8. IF THE SPECIFIED EQUIPMENT CAN NOT BE INSTALLED AS SHOWN ON THESE DRAWINGS,THE CONC CONCRETE PCS PERSONAL COMMUNICATION SYSTEM <br /> CONTRACTOR SHALL PROPOSE AN ALTERNATIVE INSTALLATION FOR APPROVAL BY THE CONSTRUCTION CONST CONSTRUCTION it PLATE <br /> 116111(11) <br /> MANAGER. CONT CONTINUOUS PR PAIR <br /> CTR CENTER PSI POUNDS PER SQUARE INCH <br /> 9. CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENTS TO CONFIRM LENGTHS OF CABLE TRAYS, DIA/0 DIAMETER PSF POUNDS PER SQUARE FOOT <br /> ELECTRICAL LINES,AND ANTENNA CABLES. DTL DETAIL PT PRESSURE TREATEDOil <br /> (E) EXISTING RAD RADIUS <br /> 10. ROUTING OF ALL CONDUITS,CABLES,CABLE TRAYS,ETC.IS INDICATED AS PROPOSED LOCATIONS ONLY. EA EACH RD ROOF DRAIN <br /> CONFIRM THE EXACT ROUTING WITH THE ON-SITE CONSTRUCTION MANAGER PRIOR TO THE START OF EJ EXPANSION JOINT REINF REINFORCED/REINFORCING <br /> WORK. ELEC ELECTRIC/ELECTRICAL REQ'D REQUIRED <br /> EL ELEVATION RM ROOM <br /> 11. ALL DAMAGE OR OPENING UP OF THE EXISTING STRUCTURE MUST BE MADE GOOD TO THE EQ EQUAL R/W RIGHT OF WAY <br /> PRE-CONSTRUCTION CONDITION OR BETTER. EW EACH WAY SCHED SCHEDULE <br /> EXP EXPANSION SECT SECTION <br /> 12. INSPECTION OF COMPLETED WORK IS REQUIRED BEFORE COVERING UP.PROVIDE A MINIMUM OF 72 EXT EXTERIOR SF SQUARE FOOT d Sfi,AN i PIE k SA `' <br /> HOURS NOTICE TO CONSULTANT. FD FLOOR DRAIN SIM SIMILAR snrYeying <br /> FIN FINISH SQ FT SQUARE FOOT Engineering <br /> 13. REMOVE AND CLEAN UP ANY DEBRIS OR MATERIAL FROM THE SITE THROUGHOUT THE DURATION OF THE FIN FLR FINISH FLOOR SS STAINLESS STEEL D I Planning <br /> CONTRACT ON A DAILY BASIS AND UPON COMPLETION OF THE WORK AS DIRECTED BY THE FLR FLOOR STD STANDARD <br /> CONSTRUCTION MANAGER. 20210142nd Avenue NE Ph.425.806.1869 <br /> FTG FOOTING STL STEEL Woodinville,WA 98072 R.425.482.2893 <br /> GA GAUGE STRUC STRUCTURAL „ww.LDCoorp.cotn <br /> 14. OBTAIN AND PAY FOR ALL ELECTRICAL PERMITS AND INSPECTIONS REQUIRED FOR COMPLETION OF GALV GALVANIZED TEMP TEMPORARY <br /> WORK AND ACCEPTANCE.PROVIDED CERTIFICATES TO THE CONSTRUCTION MANAGER VERIFYING THAT GYP GYPSUM THK THICK <br /> THE WORK CONFORMS TO THE REQUIREMENTS OF ALL CODES AND AUTHORITIES HAVING JURISDICTION. GB GYPSUM BOARD T.O. TOP OF DATE: 2-28-19 <br /> HM HOLLOW METAL TOS TOP OF STEEL DRAWN BY: KTL <br /> 15. PROVIDE VERIZON WITH A WRITTEN WARRANTY,EFFECTIVE FOR ONE YEAR AFTER DATE OF HOR HORIZONTAL TOC TOP OF CONCRETE CHECKED BY: RBH <br /> a ACCEPTANCE.FOR THE COMPLETE INSTALLATION REPAIR OR REPLACE ANY DEFECTS ARISING DURING HR HOUR TYP TYPICAL <br /> THIS PERIOD AT NO EXTRA COST TO VERIZON. HT HEIGHT UNO UNLESS NOTED OTHERWISE <br /> • HVAC HEATING VENTILATION AIR CONDITIONING VERT VERTICAL SUBMITTALS <br /> , 16. NO DEVIATIONS FROM DESIGN SHOWN ON THESE DRAWINGS IS ALLOWED WITHOUT WRITTEN APPROVAL INSUL INSULATION W/ WITH REV DATE DESCRIPTION BY <br /> FROM THE CONSULTANT.FAILURE TO OBSERVE THIS RULE MAY RESULT IN CONTRACTOR CORRECTING INT INTERIOR WWM WELDED WIRE MESH 1 2.28-,9 PRELIMINARY CONSTRUCTION KTL <br /> THE INSTALLATION AT THEIR EXPENSE. 2 44-19 FINAL CONSTRUCTION AAL <br /> ICI -- — <br /> 17. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL AND NATIONAL CODES,REGULATIONS AND SAFETY <br /> ii <br /> REGULATIONS.ALL OSHA REGULATIONS,ALL PUBLIC AND MUNICIPAL AUTHORITIES,AND ANY UTILITY <br /> s COMPANIES'REGULATIONS AND DIRECTIVES. , <br /> s 18. THE DRAWINGS AND SPECIFICATIONS ARE A GENERAL DIRECTIVE FOR THE SCOPE OF WORK.EXACT <br /> o DIMENSIONS AND LOCATIONS MAY CHANGE IN THE FIELD.THE CONTRACTOR IS TO VERIFY THE <br /> ! DIMENSIONS AND LOCATIONS AND REPORT ANY AND ALL DISCREPANCIES TO REPRESENTATIVE.ANY <br /> oMINOR ERRORS AND OMISSIONS IN THE DRAWINGS AND SPECIFICATIONS DOES NOT EXCUSE THE 8828 REGISTERED <br /> 8 CONTRACTOR FROM COMPLETING THE PROJECT AND IMPROVEMENTS IN ACCORDANCE WITH THE ARCHITECT <br /> INTENT OF THESE DOCUMENTS. .• ` 9- / <br /> 19. VERIFICATION THAT EXISTING MONOPOLE CAN SUPPORT THE PROPOSED ANTENNA,COAX AND \ RICHAR. ALL <br /> ADDITIONAL EQUIPMENT LOADING IS TO BE DONE BY OTHERS. \`STATE OFWASRINOTON <br /> EXPIRES:8-20-19 *,��' <br /> i 20. ANTENNA AZIMUTHS SHOWN ON THESE DRAWINGS ARE BASED ON TRUE NORTH.ALL AZIMUTHS MUST BE <br /> • VERIFIED WITH THE CORRECT RFDS PRIOR TO CONSTRUCTION. <br /> a APPROVAL STAMP <br /> 0 <br /> `t <br /> LEGEND AND SYMBOLS: �7 <br /> CHAIN LINK FENCE X X O//// <br /> CEDAR FENCE ❑ ❑ <br /> POWER P <br /> UNDERGROUND POWER uSP <br /> m TELCO T SITE <br /> UNDERGROUND TELCO 857 <br /> b OVERHEAD POWER Oil T19-601 <br /> o BOUNDARY -- <br /> CENTERLINE SEA GARFIELD-4 RX <br /> A3200 20TH ST <br /> REVISION BUG <br /> /X EVERETT,WA,98201 <br /> ELEVATION PROPOSED ELEVATION SHEET TITLE <br /> \-!0'-0"AGL GENERAL NOTES <br /> 0 <br /> g DETAIL NUMBER le <br /> SHEET NUMBER X CPE 2 Business Days Before You Dg <br /> ® SHEET NUMBER <br /> SECTION BUG , 1-rt800 es Underground 424&555tion 5 <br /> 'e NONTANA,WASHINGTON) G-1 .0 <br />