My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014/08/27 Council Agenda Packet
>
Council Agenda Packets
>
2014
>
2014/08/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2020 11:34:16 AM
Creation date
2/25/2020 11:31:40 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/27/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A' <br /> DELIVERABLES <br /> Three fmal hard copies of the JARPA and supporting documentation,one set of <br /> reproducible construction drawings and specifications,and two electronic copies of the <br /> construction plans and specifications. <br /> Two draft copies of the JARPA and supporting documentation,Plans, Specifications,and <br /> Engineering Estimates of Costs will be provided for the regulatory agencies. <br /> BUDGET <br /> The maximum amount payable to the Engineer for completion of all work associated <br /> with this project for the engineering services based on decommissioning the pressure and <br /> gravity tunnel, including contingencies, salaries,overhead, direct non-salary costs, and <br /> net fee shall be$33,680. All fees and expenses will be presented using a mutually <br /> agreed-upon standard itemized invoice. <br /> G&O#20145.83 Page 3 of 3 <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.