My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants 2/24/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
BHC Consultants 2/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 9:19:59 AM
Creation date
2/27/2020 9:19:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants
Approval Date
2/24/2020
Council Approval Date
2/12/2020
End Date
12/31/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
Engineering Analysis Potable Water Pump Stat
Tracking Number
0002242
Total Compensation
$588,785.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> 2. Documents pertaining to Change Orders. <br /> 3. Digital files with field reports, photos, and other pertinent field documentation. <br /> 4. Start-up and testing checklist. <br /> 5. Draft punch list. <br /> 6. One (1) hard copy and one (1) electronic copy (Adobe PDF format) of Record Drawings. <br /> 7. One (1) hard copy and one (1) electronic copy (Adobe PDF format) of operations and <br /> maintenance manual. <br /> Task 600 — Additional Services as Requested by the Owner <br /> Objective <br /> This task has been included to cover additional work identified by the City not included in the <br /> Scope of Services. <br /> Fee <br /> The Level of Effort, or consultant fee, estimated for all six (6) tasks, including subconsultants <br /> and other direct costs (ODCs) is $588,785.00. A detailed breakdown of the Level of Effort is <br /> attached and labeled Exhibit B. <br /> Schedule <br /> The schedule lengths for Tasks 100 through 500 are as follows: <br /> • Task 100: Project Management (total of Tasks 200 — 500) 25 months <br /> • Task 200: Pre-Design Analysis 3 months <br /> • Task 300: Design <br /> o Subtask 301: Sixty (60) Percent Design 3 months <br /> o Subtask 302: Ninety (90) Percent Design 3 months <br /> o Subtask 303: Final Design 2 months <br /> • Task 400: Bid Assistance 2 months <br /> • Task 500: Engineering Services During Construction 12 months <br /> A schedule diagram is attached and labeled Exhibit C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.