Laserfiche WebLink
J-736 <br />Page 15 <br />It is also recouunended that Hart-Crowser & Associates be re- <br />tained to provide soil engineering services during construction <br />of the excavation and foundation phases of the work. This is <br />to observe.compliance with Che design concepts, specification� <br />or recommendations and to allow design changes in the event <br />that subsurface conditions differ from that anticipated prior <br />to start of construction. <br />HART-CROWSER & ASSOCIATES, INC. <br />p4n ,, �\ �rA!/� <br />IV `j�IAE��L A�, PAGANO <br />Geotechnical Engineer <br />�� <br />ROWSER, .E. <br />Vice-P=esident <br />rIAF : cb <br />, '�� � <br />��Y <br />�, <br />G y.� <br />4 <br />f�;STEPE� .;'�� <br />lO��ni E�`�'.;�1) <br />e <br />