Laserfiche WebLink
incompatible uses. The school district, its students, and various community groups who utilize <br />Memorial Stadium will have access to the new display. <br />Conclusion: 7'he proposed video board would not adversely alter the basic appearance or character <br />of Memorial Stadium and would not generate harmful impacts on the neighborhood. The proposal is <br />consistent with the Everett Comprehensive Plan. <br />10. Compliance wit6 the provisioos of this Ordioence and other City, State and Federal <br />regdletions. <br />Findings: The proposal will comply with the Intemational IIuilding and Fire Codes and Public <br />Works Standard Manual. <br />Conclusion: With conditions, the proposal will comply with the provisions of the City's Zoning <br />Code, Building and Fire Codes, and Public Works Standard Manual. The applicant shall obtain all <br />necessary pertnits from the City prior to installing the strucwre. <br />11. Accessibility to public transit, and traffic reducHon measures proposed by the applicant to <br />reduce dependence of the proposed use on the automobilc. <br />Findings: The site is locate� on a major arterial streeL The ncarest transit route is locatcd on <br />Broadway, onc block to ihc cast. <br />Conclusion: Accessibiliry of the site to public tnnsit is adequate, <br />DECISION: The proposal is approved as submitted subject to compliance with all city, state anJ fe.lerel <br />regulations. '1'hc following conditions shall apply: <br />I. A building pertnit will bc requircd for this installatiou. <br />2. Thc acccpted proposcd location of thc vidco board is shown in Exhibit A. <br />3. Tlre light intensity of the video board sl�all be regulatcd during cach game so that as the ambient <br />lighting outsidc the stadium decrcases Gom aRemoon to evening, the generated light output viill <br />diminish in proportion. If thc vidw board crcatcs additional light and glarc impacts, a lighting impact <br />analysis shall be prepar� and additional monitoring and control of the video board's output shall be <br />implcmcntcd. <br />4. The video board shall be used only for onc hour preceding and during the game on gamc days. All <br />other days, thc video board and advertizing pancls shall remain off. <br />5. The video board nmst bc locatccl behind the existing outficld all with approximately a 15 degree <br />orientation to the third base side as marked with whitc paint on the ground on May 13, 2009. <br />6. Opaque ncuing nmst be installcd bctW�ecn the first thrce poles that supoort the outfield netting starting <br />�ti�ith the pole tliat is closest to 38°i Street running to thc south to ensure that the video score board is <br />not ��isiblc from Bmadway. <br />