Laserfiche WebLink
PUBLIC WORKS <br /> ZY <br /> estimated record of location. This information will need to be updated upon <br /> completion of the project and provided as "as-builts" for inclusion on the City's <br /> master WFP as-built file. This as-built file has been previously provided to you <br /> as a base for your design. Please note, when including the City's information <br /> into your drawing do not alter the City's base information including the location of <br /> any facilities, reference points, notes, etc. <br /> • Please provide typical trench cross section details for buried facilities including <br /> along the surface of the Dam and in the roadway/shoulders. At a minimum <br /> please include minimum depth of bury, bedding materials, conduit type and size, <br /> number of conduits, proposed encasement material (CDF, gravel,?) and backfill <br /> material above the encasement with compaction requirement. <br /> • Please provide horizontal off-set information and a typical trench section for the <br /> area where your facilities will parallel, and cross, the 1960's era cast iron <br /> watermain which runs along the western end of the dam. As we have discussed <br /> this 50+ year old watermain is a crucial piece of infrastructure that is required in <br /> the City's ability to make clean drinking water, and its protection during your work <br /> is of the utmost importance. Therefore, we wish to review how close you will be <br /> excavating to this pipe, what your depth will be and how you propose to cross the <br /> watermain without damaging it. <br /> • Please provide a detailed drawing of your crossing under the City's above grade <br /> steel siphon and return lines located at the eastern side of the dam. The City is <br /> interested in how the work will be performed to trench under these pipelines. <br /> • Please provide the location of all vaults including offset off of road centerline. <br /> Please also provided information on the vaults themselves including manufacture <br /> cuts sheets. We assume the vault lids will be traffic rated, please indicate this on <br /> your drawings. <br /> • Please provide a typical trench section for the area where your facilities will cross <br /> the new 30" drainage culvert that crosses the Portal 2 road. Once I know where <br /> your line will be located in regard to the centerline of the road I can provide you <br /> with the approximate depth of the new culvert. <br /> Once submitted, the City will review and comment on your plans including a request for <br /> resubmittal should any additional information be required. Once approved, a copy of <br /> the approved plans will be provided to you for use in the field. Please note the City's <br /> Construction Management Division will require notification prior to any work being <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax c2/ <br /> (425) 257-8882 <br />