My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6133 LAKE CHAPLAIN RD 2020-03-09
>
Address Records
>
LAKE CHAPLAIN RD
>
6133
>
6133 LAKE CHAPLAIN RD 2020-03-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2020 10:07:49 AM
Creation date
3/9/2020 10:05:53 AM
Metadata
Fields
Template:
Address Document
Street Name
LAKE CHAPLAIN RD
Street Number
6133
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> Drawing Specification Number, <br /> Comment No. Comment Comm. Response/2nd Review Comment Response/3rd Review Comment Response/4th Review Comment <br /> Number page,subsection number <br /> Addressed with plan revision. N/A N/A <br /> Provide notes or clearly reference PUD specifications <br /> 10 100016377-7 Layout pertaining to temporary trench backfill material and ZB <br /> compaction,temporary site stablization methods, and <br /> long-term site stablization/restoration methods. <br /> Provide note to notify City of Everett inspector prior to Addressed with plan revision. N/A N/A <br /> 11 100016377-7 Layout excavation near existing utilities or commencing ZB <br /> conduit/utility crossings. <br /> Show all existing utilities near construction zone to Addressed with plan revision. N/A N/A <br /> 12 2638-13 Layout minimize conflicts during construction. ZB <br /> Linework shown between MSD-139 and A-51342 is Addressed with plan revision. N/A N/A <br /> 13 2638-13 Layout inconsistent with Trench Section B. ZB <br /> Clearly indicate all utility crossings and provide Partially addressed with plan revision. Note calling Note calling out 12"minimum vertical clearance Addressed with plan revision. <br /> 14 2638-13 Layout typical detail of utility crossing. Proposed conduits ZB out 12"minimum vertical clearance between conduit between conduit casing and utilities required. <br /> shall be routed beneath all existing utilities with 12" casing and utilities required. <br /> minimum vertical clearance. <br /> Provide more detailed location information for Addressed with plan revision. N/A N/A <br /> 15 2638-13 Detail 2 proposed vault A-51342 via addition of dimension ZB <br /> callouts in zoomed in view. <br /> 16 2638-13 Detail 2 Provide typical vault detail.Vault tops and lids shall ZB Addressed with plan revision. N/A N/A <br /> be traffic rated. <br /> 17 2638-13 Detail 2 Show minimum 5 foot separation between conduit ZB Addressed with plan revision. N/A N/A <br /> trench and surge tank foundation. <br /> 18 2638-13 Layout Show minimum 5 foot separation between conduit ZB Addressed with plan revision. N/A N/A <br /> trench and concrete spillway. <br /> Provide detail view of work area on dam near 8"cast Not addressed. Please clearly show or note the many Addressed with plan revision. N/A <br /> iron waterline, hypochlorite piping, and underground utility crossings in the vicinity of the 8"cast iron <br /> 19 2638-13 Layout-Dam power line to ensure contractor notes numerous utility ZB waterline. <br /> crossings in the area. <br /> Provide 10 foot minimum separation between Addressed with plan revision. N/A N/A <br /> proposed trench and 8"cast iron water line. (Note: <br /> 20 2638-13 Trench Section C, there is approximately 18 feet separation between the ZB <br /> water line and survey monument 1262 in this area.) <br /> Provide note requiring that centerline of trench Not addressed. Note is required on plan. Not addressed. Note is required on plan. Addressed with plan revision. <br /> crossing the dam must be staked by contractor/PUD <br /> and inspected and approved by City of Everett Water <br /> 21 2638 13 Notes Filter Plant representative prior to commencement of ZB <br /> construction within dam prism. Provide note to notify <br /> City of Everett inspector prior to excavation near <br /> existing utilities or commencing conduit/utility <br /> crossings. <br /> Provide detail for conduit crossing at 8"cast iron Partially addressed. Notes calling out 12"minimum Notes calling out 12"minimum vertical clerance and Addressed with plan revision. <br /> waterline. Proposed conduits shall be routed beneath vertical clerance and method(s)of supporting cast method(s)of supporting cast iron water line during <br /> 22 2638-13 Layout-Dam waterline with 12"minimum vertical clearance. ZB iron water line during construction required. construction required. <br /> Method of support for cast iron waterline during <br /> construction required to be noted/shown. <br /> S:\ZBrown\WFP\Projects\PUD Fiber Line\PUD Fiber Plans 102618_Comment Log (2 J <br />
The URL can be used to link to this page
Your browser does not support the video tag.