My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 SCENIC DR SNO CO PUD 2020-03-10
>
Address Records
>
SCENIC DR
>
1707
>
SNO CO PUD
>
1707 SCENIC DR SNO CO PUD 2020-03-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2020 8:23:37 AM
Creation date
3/9/2020 4:07:58 PM
Metadata
Fields
Template:
Address Document
Street Name
SCENIC DR
Street Number
1707
Tenant Name
SNO CO PUD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
513
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEPA ENVIRONMENTAL CHECKLIST FOR <br /> Beverly Park Switching Station Expansion AGENCY <br /> P.U.D. NO. 1 of Snohomish County USE <br /> B. Environmental Elements <br /> 1. Earth <br /> a. General description of the site(circle one): <br /> • Flat, rolling, hilly, steep slopes mountainous, other . <br /> b. What is the steepest slope on the site (approximate percent slope)? <br /> • The site generally slopes from the south west to the north east. <br /> • The overall existing 115kV yard is relatively flat(less than 2% slope). <br /> • The proposed 230kV yard to the east will be graded relatively flat <br /> (approximately 2% slope). <br /> • The steepest natural slope is approximately 42%. <br /> c. What general types of soils are found on the site (for example, clay, sand, gravel, <br /> peat, muck)? If you know the classification of agricultural soils, specify them and <br /> note any prime farmland. <br /> • Zero to eight inches of topsoil outside the existing 115kV yard. <br /> • Fill consisting of loose silty fine sand and gravel to depths up to ten feet in <br /> some locations. <br /> • Weathered glacial till underlies topsoil and fill. <br /> • Unweathered glacial till underlies the weathered glacial till or fill materials. <br /> d. Are there surface indications or history of unstable soils in the immediate vicinity? If <br /> so, describe. <br /> • The site does not have a history of unstable soils. <br /> e. Describe the purpose, type, and approximate quantities of any filling or grading <br /> proposed. Indicate source of fill. <br /> • Excavation, grading and filling will expand the existing 115kV yard at <br /> approximately the same elevation, and the 230kV yard to the east will be <br /> approximately ten feet lower in elevation. <br /> • An approximate estimate of the earthwork quantities are: Stripping of <br /> topsoil 1,800 CY, Cutting 1,300 CY, Filling 15,700 CY of imported fill. <br /> • Stripped topsoil materials will be stockpiled and spread over disturbed <br /> areas and reseeded or removed from the site. <br /> • Existing loose fill materials will be excavated and re-compacted as <br /> structural fill, with debris and rubble encountered removed from the site. <br /> • Fill material will be imported from a source to be determined by the <br /> construction contractor. <br /> - - /3 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.