Laserfiche WebLink
SEPA ENVIRONMENTAL CHECKLIST FOR <br /> Beverly Park Switching Station Expansion AGENCY <br /> P.U.D. NO. 1 of Snohomish County USE <br /> 15. Public Services <br /> a. Would the project result in an increased need for public services (for example: fire <br /> protection, police protection, health care, schools, other)? If so, generally describe. <br /> • Beverly Park Switching Station is an existing facility currently providing an <br /> essential public service. The expansion of the facility and the addition of <br /> equipment are not expected to increase the need for additional public <br /> services. The proposed project will provide additional public service to the <br /> community. <br /> b. Proposed measures to reduce or control direct impacts on public services, if any. <br /> • NIA <br /> 16: Utilities <br /> a. Circle utilities current) •available at the site. ectric' , natural gas,cater refuse <br /> one, sani At sewer, septi• system <br /> • No additional utilities are planned for the site <br /> b. Describe the utilities that are proposed for the project, the utility providing the <br /> service, and the general construction activities on the site or in the immediate vicinity <br /> which might be needed. <br /> • Power: Snohomish County PUD No 1 <br /> • Water: City of Everett (if required for landscape irrigation) <br /> C. The above answers are true and complete to the best of my knowledge. I understand <br /> that the lead agency is relying on them to make its decision. <br /> Name: Hoson Lau, P.E. <br /> Title: Project Leader • <br /> Signature: <br /> Date completed: Z.rt� 2,S1 7.„® <br /> -Rage 23 of 23 J(j� <br /> 1 <br />