My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 1/29/2020 Change Order 5
>
Contracts
>
Capital Contract
>
Faber Construction Corporation 1/29/2020 Change Order 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:59:42 AM
Creation date
3/30/2020 11:59:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
1/29/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Expansion
Amendment/Change Order
Change Order
Amendment/Change Order Number
5
Tracking Number
0001602
Total Compensation
$154,436.75
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No.: Five <br /> Change Order Effective Date: Date of Mayor's Signature <br /> CITY <br /> Attest: Approved As to Form: <br /> Office of the City Attorney <br /> APPROVED AS TO FORM <br /> David C.Hall,City Attorney <br /> Mayor t ity Clerk City Attorney <br /> Date: / o Date: ///a-q/o't0d 6 Date: t•14•'LP <br /> Recommended By:_ <br /> Construction Project Manager (if Engineering Department Director <br /> Manager (if applicable) Manager (if <br /> applicable) applicable) <br /> ill- 'r► A/f/ ..4611/ <br /> Date: Date: Date: Date: <br /> //z7/Z,I Z o ��271 020 <br /> CONTRACTOR <br /> By 1-111/1-----k-- <br /> Date: % • 2-42-4 • zozo <br /> Officer o <br /> Exhibit A—Description of Changed Work <br /> Change Order No. Five contains a list of additional work that is required to: <br /> (a) Correct unforeseen conditions in the existing site and building. <br /> (b) Correct oversights in the original plans and specifications. <br /> (c) Comply with codes or rulings of building officials, and building inspectors. <br /> (d) Improve the quality of appearance and performance of the site and building. <br /> (e) Events/Circumstances: See Attached Exhibit A Matrix. <br />
The URL can be used to link to this page
Your browser does not support the video tag.