Evergreen Branch Library Expansion 1/13/2020 <br /> Change Order No. 5- Evergreen Branch Library Expansion Exhibit A <br /> No. Construction Change Directives Amount <br /> 1 Provide & install PVC conduit for owner provided phone/data line to new irrigation controller. $ 1,252.29 CO#57 <br /> 2 Demo existing mortar bed in restrooms & replace deteriorated floor drains. $ 15,482.63 CO#62 <br /> 3 Provide alternate door gaskets for(6) exterior doors. $ 569.72 CO#63 <br /> 4 Future Charging Station - Provide civil/site improvements only $ 5,325.62 CO#67 <br /> 5 Added & Clear Grub- Per direction of RFI 106, &discussion on site, add! clear&grub activities CO#69 <br /> included removal of several existing trees in required to meet the design intent. $ 9,573.19 <br /> No. Faber Construction, Corp. Change Proposals Amount <br /> 1 Credit for eliminating lobby roller window shades. $ (498.83) CO#55 <br /> 2 Abatement clearance requirements with add'I testing gaining clearance for non-asbestos workers. $ 979.13 CO#56 <br /> 4 Repair& replace existing defective & missing irrigation components at point of connection. $ 3,882.93 CO#59 <br /> 5 Plywood backing at clearstory ceiling to provide support for hanging artwork anchors. $ 2,053.75 CO#60 <br /> 6 Per RFI 47, provide & install self-leveling cementitious underlayment at slab on grade at old garage. $ 8,240.12 CO#61 <br /> 7 Permit Change Review-404 LF of 6"ADA storm to 8"ADA storm, Add'I 83 LF of 8" storm CO#64 <br /> 46 LF of 6" DI storm to 8" DI storm, 37 LF of 8"ADA storm to 12", 30 LF of 12" DI storm, <br /> Added CB-15-48"type-2 catch basin, added CB-14-72"type catch basin, deduction of zurn area <br /> drain &addition of type-1 catch basin due to upsize of pipe. $ 31,373.89 <br /> 8 Asphalt modifications - Increase HMA due to conditions & modifications required from grade CO#65 <br /> discrepansies at existing parking lot-insufficient depth of existing pavement. $ 29,038.76 <br /> 9 Electrical &data vaults -444 electrical vault, resetting of 444 elect. vault per COE request& CO#66 <br /> low-voltage electrical vaults in city sidewalks along Evergreen Way. $ 14,183.66 <br /> 10 Loss of abiltiy to stockpile-due to the duplex building not being able to demolish at the onset CO#68r1 <br /> of work, there was asumed to be approx. 1400 yards of usable soil that was to be stockpiled for <br /> reuse. To maintain schedule, that stockpile could not be created due to space limitations. That <br /> Material had to be hauled off& new gravel borrow brought in as needed. 1,583 tons added $ 32,979.89 <br /> Total: $ 154,436.75 <br />