Laserfiche WebLink
To:James Bronder<JBronder@everettwa.gov> <br /> Cc:Adam Clark<Adam@2812architecture.com> <br /> Subject: Bus Garage Modernization <br /> Hello James, <br /> Per the submittal for the Bus Garage Modernization dated 30th July, 2019. <br /> It looks as though we will not have any issues with the allowable area if we were to consider this a 3B type Building. <br /> Do you agree? <br /> Regards, <br /> Paul Douglas <br /> 2812 Architecture <br /> 2812 Colby Avenue <br /> Everett, WA 98201 <br /> (425) 252-2153 p <br /> (425) 742-8130 f <br /> paul@ 2812architecture.com <br /> Cb; <br />