A <br /> qb <br /> ZG F. 925 Fourth Avenue <br /> Suite 2400 Memo <br /> Seattle,WA 98104 <br /> T 206 623 9414 <br /> F 206 623 7868 Date August 14,2019 <br /> Project No. S23240 <br /> ZIMMER GUNSUL FRASCA ARCHITECTS LLP Project Name PRMCE—Colby Campus <br /> D ECEEIVE Pharmacy Replacement <br /> AUG 14 2019 Page No. 1 of 9 <br /> To Drew Martin,City of Everett r <br /> CITY OF EVERETT <br /> From James Harman, ZGF; Melinda Wit-REMO it Services <br /> Subject Building Permit Review Comments—Plan Check No:B1905-020 <br /> This memo provides the responses to the Permit Review comments issued in a letter to Jim Grafton at Providence Everett <br /> dated June 25th,2019 from the City of Everett for the Providence Everett Medical Center,C Wing,Level 2, Colby Campus <br /> Pharmacy Replacement.Additional comments were provided by Drew Martin via an e-mail on July 17,2019.Those comments <br /> have been incorporated into this response in red. A third round of comments was received from Drew Martin on August 13, <br /> 2019;these comment responses are included on page 7 of this document. <br /> Architectural <br /> General: <br /> 1. The proposed project represents Phase 1 of a multi-phase scope of work. The Sheet List on Sheet A0.01 lists work that is <br /> not included in the current project. These sheets should be removed from the list for clarity. In addition, Cover Sheet <br /> A0.00 should state"Phase 1". See IBC Section 107.2.1 <br /> Response: "Phase 1"was added to cover sheet.All sheets referencing Phase 2 have been removed from the Sheet List on <br /> Sheet A0.01. <br /> 2. Work on existing buildings shall comply with the IEBC. The IEBC provides three alternative methods for performing <br /> work: the Prescriptive Compliance Method (Section 301.1.1),the Work Area Method (301.1.2),and the Performance <br /> Compliance Method (301.1.3). The method selected for the project should be specified in the General Notes on Sheet <br /> A0.01 under General Note 4. A statement should be provided clarifying the types of work that are included in the project <br /> (e.g.,repairs, additions,change of occupancy, etc.) and referencing the appropriate IEBC sections. The comments <br /> provided herein presume the project will comply with the Work Area Method of Chapter 5. Based on a review of the <br /> construction drawings,the proposed project appears to include the following work:Level 2 Alternations (Chapter 8). <br /> Additional and alternative types of work required for the project shall be identified by the designer-of-record. Additional <br /> comments may be pending. See IBC Section 101.4.7,and IEBC Sections 301.1 and 504. <br /> Response: Sheet A0.02 Code Review has been added to the set to address this comment.The Work Area Method has been <br /> selected for this project.A Project Description has been added to sheet A0.02 to define the type of work that is being <br /> performed and a narrative to describe the purpose of the renovation.No change of occupancy is occurring with this project. <br /> Additional notes have been added to show conformance with Chapter 8 of the IEBC for Level 2 Alterations. <br /> 3. The construction drawings appear to be incomplete. Review comments have been provided to assist the designer-of- <br /> record (DOR)in revising the drawings. Additional comments may be provided pending a review of the revised submittal <br /> documents. The drawings shall be revised to clearly show the intended construction. See IBC Section 107.2.1. Items <br /> requiring correction include,but are not limited to,the following: <br /> a. Sheet A6.01 shows multiple unidentified rooms between Grids 1.1 and 3.3. <br /> b. Sheet A6.01 shows an unmarked room between Grids E-F/3-3.3 that cannot be accessed. The room is also <br /> not enclosed due to a narrow gap between closely spaced wall on Grid 3.3. <br />