My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 2ND FLOOR 2021-02-17
>
Address Records
>
COLBY AVE
>
1321
>
2ND FLOOR
>
1321 COLBY AVE 2ND FLOOR 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 7:38:55 AM
Creation date
4/1/2020 1:43:48 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
2ND FLOOR
Notes
PHARMACY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> qb <br /> ZG F. 925 Fourth Avenue <br /> Suite 2400 Memo <br /> Seattle,WA 98104 <br /> T 206 623 9414 <br /> F 206 623 7868 Date August 14,2019 <br /> Project No. S23240 <br /> ZIMMER GUNSUL FRASCA ARCHITECTS LLP Project Name PRMCE—Colby Campus <br /> D ECEEIVE Pharmacy Replacement <br /> AUG 14 2019 Page No. 1 of 9 <br /> To Drew Martin,City of Everett r <br /> CITY OF EVERETT <br /> From James Harman, ZGF; Melinda Wit-REMO it Services <br /> Subject Building Permit Review Comments—Plan Check No:B1905-020 <br /> This memo provides the responses to the Permit Review comments issued in a letter to Jim Grafton at Providence Everett <br /> dated June 25th,2019 from the City of Everett for the Providence Everett Medical Center,C Wing,Level 2, Colby Campus <br /> Pharmacy Replacement.Additional comments were provided by Drew Martin via an e-mail on July 17,2019.Those comments <br /> have been incorporated into this response in red. A third round of comments was received from Drew Martin on August 13, <br /> 2019;these comment responses are included on page 7 of this document. <br /> Architectural <br /> General: <br /> 1. The proposed project represents Phase 1 of a multi-phase scope of work. The Sheet List on Sheet A0.01 lists work that is <br /> not included in the current project. These sheets should be removed from the list for clarity. In addition, Cover Sheet <br /> A0.00 should state"Phase 1". See IBC Section 107.2.1 <br /> Response: "Phase 1"was added to cover sheet.All sheets referencing Phase 2 have been removed from the Sheet List on <br /> Sheet A0.01. <br /> 2. Work on existing buildings shall comply with the IEBC. The IEBC provides three alternative methods for performing <br /> work: the Prescriptive Compliance Method (Section 301.1.1),the Work Area Method (301.1.2),and the Performance <br /> Compliance Method (301.1.3). The method selected for the project should be specified in the General Notes on Sheet <br /> A0.01 under General Note 4. A statement should be provided clarifying the types of work that are included in the project <br /> (e.g.,repairs, additions,change of occupancy, etc.) and referencing the appropriate IEBC sections. The comments <br /> provided herein presume the project will comply with the Work Area Method of Chapter 5. Based on a review of the <br /> construction drawings,the proposed project appears to include the following work:Level 2 Alternations (Chapter 8). <br /> Additional and alternative types of work required for the project shall be identified by the designer-of-record. Additional <br /> comments may be pending. See IBC Section 101.4.7,and IEBC Sections 301.1 and 504. <br /> Response: Sheet A0.02 Code Review has been added to the set to address this comment.The Work Area Method has been <br /> selected for this project.A Project Description has been added to sheet A0.02 to define the type of work that is being <br /> performed and a narrative to describe the purpose of the renovation.No change of occupancy is occurring with this project. <br /> Additional notes have been added to show conformance with Chapter 8 of the IEBC for Level 2 Alterations. <br /> 3. The construction drawings appear to be incomplete. Review comments have been provided to assist the designer-of- <br /> record (DOR)in revising the drawings. Additional comments may be provided pending a review of the revised submittal <br /> documents. The drawings shall be revised to clearly show the intended construction. See IBC Section 107.2.1. Items <br /> requiring correction include,but are not limited to,the following: <br /> a. Sheet A6.01 shows multiple unidentified rooms between Grids 1.1 and 3.3. <br /> b. Sheet A6.01 shows an unmarked room between Grids E-F/3-3.3 that cannot be accessed. The room is also <br /> not enclosed due to a narrow gap between closely spaced wall on Grid 3.3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.