My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 2ND FLOOR 2021-02-17
>
Address Records
>
COLBY AVE
>
1321
>
2ND FLOOR
>
1321 COLBY AVE 2ND FLOOR 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 7:38:55 AM
Creation date
4/1/2020 1:43:48 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
2ND FLOOR
Notes
PHARMACY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
925 Fourth Avenue <br /> Suite 2400 Memo <br /> Seattle,WA 98104 <br /> zGp r 206 623 9414 <br /> F 206 623 7868 Date August 14,2019 <br /> Project No. S23240 <br /> ZIMMER GUNSUL FRASCA ARCHITECTS LLP Project Name PRMCE—Colby Campus <br /> Pharmacy Replacement <br /> Page No. 6 of 9 <br /> ii. This is now specified in SSK-001. See sheet S1.01. <br /> iii. This is now specified in SSK-001. See sheet S1.01. <br /> iv. This is now specified in SSK-001. See sheet S1.01. <br /> v. This is now specified in SSK-001. See sheet S1.01. <br /> vi. The infill design and existing slab evaluation is specific to the anticipated opening sizes. In the unlikely event <br /> that the actual openings are significantly larger than anticipated,the entire infill design would need to be re- <br /> evaluated. <br /> vii. The anchor edge distance to bottom of slab is controlled by SSK-001 as-is.The existing slab is 8 1/2" thick, <br /> the infill is 6 1/2"thick,and the anchors are set 2" from the top of the 4"x4"ledger angles.This leaves <br /> approximately 4"of edge distance (8.5"—6.5"+2"). <br /> viii. The 4" edge distance is within the acceptable edge distance of the expansion anchor product specified. <br /> ix. This has been removed. <br /> lc.The calculations have been removed from the drawings. <br /> le.This is now specified in SSK-001,on sheet S1.01. <br /> if.The special inspection requirements have been updated and moved to the structural drawings. <br /> (New comment#2—07/17/19) <br /> 2. Sheet 1.02 indicates the addition of a penetration through the existing roof. The following comments shall be addressed: <br /> i. Structural calculations for the anchor design do not appear to be included and shall be submitted for <br /> review. The development of the wind loading shall be provided,including the profile of the exhaust fan to <br /> substantiate the effective wind area. <br /> ii. The anchors for the connection at the slab edge is installed at an angle. The existing curb is anticipated to <br /> provide minimal effective confinement. The calculations shall provide additional commentary and analysis <br /> for this configuration,including documentation from the manufacturer verifying the proposed installation,as <br /> need to substantiate the design. <br /> iii. Supplemental analysis of the existing roof for the proposed opening shall be performed as needed to <br /> substantiate the integrity of the modified roof deck. The anticipate weight of the fan (presuming it is not <br /> negligible) shall be included in the analysis. <br /> iv. The anticipated weight of the fan shall be stated in the drawings. <br /> v. The special inspections included in the response to Structural Review Comment if should be referenced for <br /> this work. Alternatively,the comments should be included as general requirements on Sheet 1.02 instead of <br /> with the floor infill detail. <br /> Response: <br /> 2. i. The structural calculations have been updated to include the rooftop exhaust fan anchorage design. <br /> ii. The anchor orientation at the slab edge condition has been modified.Anchors will be installed vertically. <br /> iii. See the updated calculation package for this analysis. <br /> iv. This is now stated in SSK-002. See sheet S1.01. <br /> v. The special inspection requirements have been stated in the structural drawings. See sheet S1.01. <br /> A meeting was held on 7/11/2019 with Drew Martin,Tony Lee,Jim Grafton,Jim Harman and Melinda Wind in attendance <br /> to review the above comments.During this meeting Drew Martin also noted that Door 018C needed to be a smoke rated door. <br /> This revision has been incorporated into the door schedule on Sheet A8.11. <br />
The URL can be used to link to this page
Your browser does not support the video tag.