My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 2ND FLOOR 2021-02-17
>
Address Records
>
COLBY AVE
>
1321
>
2ND FLOOR
>
1321 COLBY AVE 2ND FLOOR 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 7:38:55 AM
Creation date
4/1/2020 1:43:48 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
2ND FLOOR
Notes
PHARMACY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZGF 925 Fourth Avenue <br /> Suite 240Q Memo <br /> Seattle,WA 98104 <br /> T 206 623 9414 Date August 14,2019 <br /> F 206 623 7868 <br /> Project No. S23240 <br /> ZIMMER GUNSUL FRASCA ARCHITECTS LLP Project Name PRMCE—Colby Campus <br /> Pharmacy Replacement <br /> Page No. 8 of 9 <br /> Narrative of Revisions to Permit Drawings: <br /> A0.00 COVER SHEET Added`Phase I'Note <br /> A0.01 PROJECT INFO, SHEET Updated Sheet List <br /> INDEX,SYMBOLS AND <br /> ABBREVIATIONS <br /> A0.02 CODE SUMMARY New sheet <br /> A0.21 LIFE SAFETY PLAN Egress paths added to life safety plan,rated partitions updated <br /> A1.01 PLAN,DEMOLITION— Access panel demo added to shell space <br /> PHASE I <br /> A1.11 PLAN,DEMOLITION No revisions this sheet <br /> REFLECTED CEILING— <br /> PHASE 1 <br /> A2.00 PLAN,OVERALL SITE— New sheet added to show site plan with overall facility and relationship to adjacent <br /> PRMCE CAMPUS properties <br /> A2.01 PLAN,OVERALL— New sheet added to show overall facility,accessible routes and available restroom <br /> PHASE I locations <br /> A2.02 PLAN,OVERALL— New sheet added to show overall facility,accessible routes and access to parking <br /> PHASE I locations <br /> A3.01 VIEWS,EXISTING AND New sheet added with renderings to show presence of exhaust fan stacks at roof <br /> PROPOSED <br /> CONDITIONS <br /> A6.01 PLANS,FLOOR—LEVEL Walls removed at corridor;labels added to spaces as required <br /> 2—SECTOR C—PHASE I <br /> A6.03 PLANS,PARTIAL ROOF New sheet added to show partial roof plan with exhaust fan stacks <br /> —SECTOR C—PHASE I <br /> A7.01 ELEVATIONS, Note added for signage at accessible restroom <br /> INTERIOR—TYPICAL <br /> MOUNTING HEIGHTS <br /> A7.02 ELEVATIONS, Note added for flush control location 11/A7.02 <br /> INTERIOR—PHASE I <br /> A8.01 SCHEDULE,TYPES& No revisions this sheet <br /> DETAILS,PARTITIONS <br /> A8.02 DETAILS,INTERIOR— New slab detail added 4/A8.04 to show rated assembly <br /> PARTITION <br /> A8.11 SCHEDULE TYPES& Note added to door schedule to include privacy latch at Door 045 <br /> DETAILS,DOOR& <br /> FRAME <br /> A8.21 SCHEDULE TYPES& Shell space added to Finish Schedule. <br /> DETAILS,ROOM FINISH <br /> A8.24 DETAILS,INTERIOR— No revisions this sheet <br /> CEILING <br /> A8.41 DETAILS,INTERIOR— No revisions this sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.