My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 2ND FLOOR 2021-02-17
>
Address Records
>
COLBY AVE
>
1321
>
2ND FLOOR
>
1321 COLBY AVE 2ND FLOOR 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 7:38:55 AM
Creation date
4/1/2020 1:43:48 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
2ND FLOOR
Notes
PHARMACY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> CONCRETE OBSERVATION REPORT MAYES TESTING ENGINEERS <br /> AlbratOn COMP.' <br /> Report Number: M7191527.0002 <br /> Service Date: 09/20/19 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 09/25/19 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Providence Health and Services Providence Everett MC Colby Campus Pharmacy <br /> Attn:Accounts Payable 1700 13th St <br /> 600 Broadway Ste 304 Everett, WA <br /> Seattle, WA 98122 <br /> Project No.: M7191527 <br /> Permit No.: B1905-020 Weather: Indoors <br /> Samples: (4) 4x8" cylinders <br /> On site for inspection of reinforcement and concrete placement of(2) cubic yards Cadman mix 4W50436 for slab <br /> infills at (3) locations on Level C2 in the Colby Pharmacy replacement area. Two of the pour-backs are 48x48x5" <br /> deep and the third is 20x20x5" deep. There are steel angles on (2) sides of each pour-back, connected to existing <br /> concrete with 1/2"wedge anchors (previously verified). <br /> Verified 6x6-W2.9xW2.9 welded wire fabric over metal deck, per SK001/S1.01. The concrete was placed via <br /> Georgia buggy and mechanically consolidated. Cast (4) 4x8" cylinders for compressive strength testing (4000 psi <br /> at 28 days required). <br /> To the best of our knowledge, the items inspected today are in conformance with approved plans and <br /> specifications. <br /> Services: Special Inspections/Materials Testing <br /> Mayes/Terracon Rep.: Charles Solway <br /> Reported to: Skanska USA <br /> Contractor: Skanska USA <br /> Report Distribution: <br /> (1)City of Everett WA,T Budden (1)Mayes Testing Engineers,Inc, <br /> Donna Pollard <br /> (1)Mayes Testing Engineers,Inc, (1)Providence Health and Services, Reviewed By: rM.. <br /> � � <br /> Todd Wirtz James Grafton <br /> (1)Skanska USA Building Inc,Galen Heath Defoor, PE <br /> Smith <br /> Senior Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.