City of Everett 12020 Water,Filtration,Sewer,and Stormwater Rate Study IFiN <br /> Project Time Schedule <br /> Project Time Schedule <br /> Introduction <br /> Based on the scope of service developed, a project time schedule can be developed. <br /> Project Time Schedule <br /> HDR's estimated project time schedule is, in part, driven by and based upon the availability of <br /> data, the ability to schedule internal project meetings in a timely manner, and work with City <br /> staff to develop the study final recommendations. Based upon our experience working with the <br /> City, along with the complexity of these studies, the rate study Tasks (Task 2—Task 7, Task 14) <br /> will be completed by the end of 2020. The exception to this will be Task 5 for the stormwater <br /> rate structure. This task will continue into 2021 as the City develops the approach to <br /> implementing the stormwater rates. The Tasks supporting the rate study(Task 8—Task 12)will <br /> be completed during 2020. <br /> Summary <br /> The estimated schedule is based upon the previously discussed scope of work. Given an <br /> agreed upon scope of work, HDR is willing to work with the City to establish a final project time <br /> schedule which meets the City's scheduling requirements. <br /> Page 16 <br />