My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc 3/26/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Engineering Inc 3/26/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2020 12:34:39 PM
Creation date
4/13/2020 12:33:57 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc
Approval Date
3/26/2020
Council Approval Date
3/11/2020
End Date
12/31/2021
Department
Public Works
Department Project Manager
Matt Welborn
Subject / Project Title
2020 Cost of Service Study
Tracking Number
0002267
Total Compensation
$198,715.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 12020 Water,Filtration,Sewer,and Stormwater Rate Study r <br /> Project Team r <br /> Judy Dean— Senior Financial Analyst <br /> • Over 25 years of experience in utility financial planning and rate setting. <br /> • Task Manager for the City's connection fee updates for water, sewer, and <br /> stormwater. <br /> • Task Manager for the City's impervious stormwater rate studies <br /> 1, • Developed hundreds of water cost of service and rate design analyses <br /> ;� and computer models (Excel-based). <br /> • Prior to joining HDR, worked for the City of Kennewick(WA) as a Finance <br /> Department Accountant. <br /> • Washington State Certified Public Accountant— Inactive. <br /> Tom Gould— QA/QC <br /> • Will be responsible for providing the study's overall project quality <br /> control/quality assurance. <br /> • More than 40 years of experience providing financial planning and rate <br /> studies for water and wastewater utilities. <br /> Co-instructor for the AWWA three-day Financial Management seminar for <br /> more than 25 years. <br /> • Contributing author and member of the editorial committee for the AWWA <br /> M-1 Manual, Principles of Water Rates, Fees and Charges. <br /> To assist in Tasks outlined in the scope of services, engineering assistance will be necessary. <br /> HDR wastewater engineering staff will be collaborated with to assist in reviewing and <br /> developing components of each of the tasks. <br /> Should other individuals be required for the City's study, HDR has available a number of other <br /> highly qualified financial, planning, and engineering individuals to meet any specific technical <br /> need associated with this study. <br /> Summary <br /> This section of HDR's proposal has provided an overview of the proposed project team <br /> organization for the City's study. <br /> Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.