My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2210 PINEHURST AVE 2016-05-26
>
Address Records
>
PINEHURST AVE
>
2210
>
2210 PINEHURST AVE 2016-05-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 9:23:47 AM
Creation date
5/26/2016 9:23:45 AM
Metadata
Fields
Template:
Address Document
Street Name
PINEHURST AVE
Street Number
2210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Residential Photovoltaic OTC Permit Application <br /> t Ei irzz1 <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . . in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> TO BE COMPLETED BY APPLICANT <br /> • <br /> ® Project Information <br /> Property Owner Name: ,a,- ►.j,igth W ano q,n 4 C0.it Cot bjt"r <br /> Project Address: 221 O -?i(xi-VW rS S- Parcel# b05141-1701101030 <br /> City: >Ev F r Q - State: v A ZIP: ' g 203 <br /> Day Phone: (f�0122-`107(, o , ( 10o)-5l-i -LI I sy <br /> Contractor Name , So�c�r 'vtr <br /> Contractor license#: Sri Sri 21D0 <br /> Contractor Day Phone: 2�0 �[� (p— 0 g Sc.) <br /> PV system description aridsti Sal 4..1" 1:v €x -r& -{� Incl Jck <br /> (include manufacturer _ <br /> and model#of PV (2-C) tTQ,K enst.rem CT 2$0 t-1� rhb <br /> modules and <br /> inverters): n u_ Sou_ V ip.. 52O A-Nn(‘4%3 1nV <br /> ()Determine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that Wq ❑ <br /> is code compliant to setbacks and height, or code allows expansion of nonconformity for 'd <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by ❑ <br /> the local jurisdiction. <br /> 3, Rooftop is made from lightweight material such'as a single layer of composition shingles, ❑ <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions. [IRC M2302,2] ►':i ❑ <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to ❑ <br /> administer the electrical code. [IRC M2302.2] <br /> 6. The Installation shall meet the requirements of the International Fire Code as amended `� ❑ <br /> by WA State.[IRC M2302.2] r <br /> 7, The PV system is designed for the wind speed of the local area,and will be installed per <br /> the manufacturer's specifications. [IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot. [IRC M2302.2.1(2)] 0 <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds persquare foot. [IRC M2302.2,1(3)] (� ❑ <br /> Enter total dead load of system (lbs/ft2): <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the 114 ❑ <br /> roofing to which they are affixed. [IRC M2302.2,1(4)] I <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.