My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2210 PINEHURST AVE 2016-05-26
>
Address Records
>
PINEHURST AVE
>
2210
>
2210 PINEHURST AVE 2016-05-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 9:23:47 AM
Creation date
5/26/2016 9:23:45 AM
Metadata
Fields
Template:
Address Document
Street Name
PINEHURST AVE
Street Number
2210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00111P <br /> 11. Supports for solar modules are installed to spread the dead load across as many roof- <br /> framing members as needed to ensure that no point load exceeds fifty(50)pounds. S 0 <br /> [IRC M2302.2.1(5)] <br /> 12. The photovoltaic modules and supporting structure shall be constructed of <br /> noncombustible materials or fire retardant treated wood equivalent to that required for 0 <br /> the roof construction. [IRC M2302.2.1] <br /> 13, Roof and wall penetrations shall be flashed and sealed to prevent entry of water, 0 <br /> rodents,and insects. [IRC M2302.2.2] <br /> • 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. 0 <br /> [IRC M2302.2.3] <br /> Comments: • <br /> 1=iiZ> If you answered yes to all of the above questions,the project qualifies for the over-the- <br /> counter permitting process. <br /> 0 Determine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules,inverters,and combiner boxes are identified for use in PV systems. g ❑ <br /> 2. The inverters are listed and labeled in accordance with UL 1741 and are listed for )4 0 <br /> utility interaction. [IRC M2302.4] <br /> 14 <br /> 3. The AC interconnection point is on the load side of service disconnect. [NEC 690.64(B)] ❑ <br /> 4. The system meets all current NEC,City and Washington Cities Electrical Code A '❑ <br /> requirements. <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service 0 0 <br /> disconnects. <br /> 6. Maximum load added to the panelboard is based on the rating of the panelboards bus/main OCPD <br /> combination in accordance with NEC 705.12(D)(2)(3)(b),and is limited to(check combination that <br /> applies): <br /> 0225 amp bus/200 amp main OCPD-13,440 AC watts,maximum 70 amp inverter OCPD. <br /> 0225 amp bus/225 amp main OCPD- 8,640 AC watts,maximum 45 amp inverter OCPD. <br /> 200 amp bus/200 amp main OCPD- 7,860 AC watts,maximum 40 amp inverter OCPD. <br /> 0150 amp bus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter OCPD. <br /> 0125 amp bus/125 amp main OCPD- 4,800 AC watts,maximum 25 amp inverter OCPD. <br /> 0125 amp bus/100 amp main OCPD- 9,600 AC watts,maximum 50 amp inverter OCPD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.