My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golden Eagle 3/26/2020
>
Contracts
>
Agreement
>
Golden Eagle 3/26/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 1:07:54 PM
Creation date
4/15/2020 1:07:10 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Golden Eagle
Approval Date
3/26/2020
Council Approval Date
3/25/2020
Department
Legal
Department Project Manager
Tim Benedict
Subject / Project Title
Settlement of Litigation
Tracking Number
0002273
Total Compensation
$0.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dr.Aquilini <br /> Page Two <br /> 20 September 2017 <br /> geotechnical engineers. We have observed and greatly appreciate the work that <br /> your crew or contractor has done to fill in the excavated trench and add <br /> additional soil surcharge. This should slow the ongoing earth movement. Our <br /> City Engineer is willing to collaborate with your engineering professionals toward <br /> achieving an acceptable solution. <br /> Sincerely, <br /> Day Davis, P. <br /> Director of Public Works <br /> Cc: Ryan Sass, P.E., City Engineer;Tim Benedict, Deputy City Attorney <br /> U w'\ <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.