Laserfiche WebLink
Exhibit A-1 <br /> rwhisi- l<razan UP3730 <br /> Project Experience <br /> Project:Water Mains N,0,Q, &U Replacements—Everett, WA <br /> $ Description: This project involved the installation of a new ductile iron water pipe. <br /> ; Services Provided:Krazan provided geotechnical engineering investigations to evaluate <br /> a;,.it the subsurface soil and groundwater conditions at these sites; a review of available <br /> ,\ geotechnical reports pertaining to subsurface soil and groundwater conditions in the <br /> y; ,; --44 general site area; laboratory testing; recommendations for earthwork and site <br /> n 4 <br /> r. i preparation including the suitability of on-site soils for trench backfill, placement and <br /> ' . compaction of on-site soils, the mitigation of unsuitable soil conditions, and an <br /> ='k4 evaluation of weather sensitivity during construction; recommendations for <br /> "0 ' y conventional trenching techniques, excavation, pipe support, erosion control during <br /> construction, and construction dewatering considerations; and recommendations for <br /> `" seismic design considerations including site coefficient and ground acceleration <br /> _, ` information. <br /> Client:City of Everett—Richard Hefti, (425) 257-7215 <br /> Project:Smith-Park Infiltration Study—Monroe,WA <br /> Description:This project included the replacement of the aging water and sewer lines in <br /> . -7 <br /> the areas of Smith Street and Park Street.The infiltration portion of the project includes <br /> SOPark Street, from about Monroe Street at the southern end to about Pike Street to the <br /> north. <br /> Services Provided: Our scope included explorations of the subsurface soil and <br /> "` groundwater conditions, laboratory testing, determination of infiltration rates, organic <br /> content,and Cation Exchange Capacity(CEC) and a geotechnical engineering report. <br /> Client:City of Monroe—James Gardner,Tel: (360)863-4542 <br /> Project: Roosevelt High School Athletic Field Lighting—Seattle,WA <br /> Description: This project consists of a synthetic turf field with a six lane running track <br /> surrounding it. The scope of the project included installing 4 to 6 pole mounted athletic <br /> field lighting. A geotechnical exploration and analysis soils report was required for the <br /> design of the lighting foundations. <br /> Services Provided: Krazan performed geotechnical explorations and provided a soils <br /> report in relation to the new pole mounted athletic field lighting foundations.There were <br /> four borings drilled at approximately 15 feet deep. The geotechnical report included <br /> recommendations on foundation design. <br /> Client:Seattle Public School—David Standaart,Tel: (206) 252-0662 <br /> Project: Dickinson Utility Replacement Project—Monroe,WA <br /> , Description: This project included the replacement of aging utilities in Dickinson Road. <br /> . "irefle`' "' ¢ The project also included stormwater infiltration services at various locations along <br /> __ — ,' -. - Dickinson Road. <br /> Services Provided: Geotechnical engineering explorations, soil compaction testing, and <br /> stormwater monitoring, infiltration studies, and related laboratory testing. <br /> "' Client: City of Monroe—Kim Klinkers,Tel: (360)863-4531 <br />