Laserfiche WebLink
3) Display of energy and interval demand data from the District meter to a secure internet website <br /> (meter data may be obtained via existing District meter equipment or may require upgrade of meter <br /> equipment). Charges to be covered by District include onetime set up charges for meter access,any <br /> necessary meter upgrades and any service fees for online access to energy and interval demand <br /> data; If the Participant chooses not to continue as part of TOD Program the District will cease <br /> providing online access to interval and energy data and may remove the Participant's facility meter <br /> if it was upgraded to participate in the TOD Program; <br /> 4) Provide any insights derived from review of Participant's energy usage data back to the Participant; <br /> 5) When necessary,installation of metering upgrades for the duration of this Agreement that enable the <br /> recording and transfer of Participant's facility energy and interval demand data from the meter to the <br /> internet; and <br /> 6) Access to District staff to assist Participant in interpreting the energy interval demand data and to <br /> pass on benefits that other TOD Program participants identify. <br /> B. PARTICIPANT OBLIGATIONS <br /> Participant agrees to the following: <br /> 1) Allow access to building energy use and interval demand data at the meter level to the District's <br /> service provider for display of that energy use data on a secure internet website(Participant to sign <br /> Exhibit 2 Customer Authorization to Release Information for Non-PUD Business); <br /> 2) Enroll in TOD Program by choosing either Opt-In with Rate Comparison (by using the enrollment <br /> form in the attached Exhibit 1),or Rate Comparison Only options as described above; <br /> 3) Abide by the terms of the TOD Schedule if Participant chooses the Opt-In with Rate Comparison; <br /> 4) Provide access to buildings for energy-efficiency surveyors and controls equipment installers, if <br /> needed,at a time to be scheduled by the District or its designee with Participant; <br /> 5) Respond to short surveys about Participant's experience in the TOD Program; <br /> 6) Allow the District and/or its contractor access to employees for completion of a pre-and post-TOD <br /> Program participation survey; <br /> 7) Consider transferring to a District Commission approved TOD Schedule,if Commission approval is <br /> given in a manner to be in effect at the time participant becomes active in this Pilot; and <br /> 8) Participation will not involve use of Participant's fossil fuel backup generation specifically to <br /> reduce energy and demand usage during above noted peak load periods as part of this TOD <br /> Program. <br /> C. INSTALLATION AND OWNERSHIP OF EQUIPMENT <br /> The District, or a District contracted installer,may install an upgraded meter with connectivity (if required, <br /> as determined by District)at the Participant's location.The meter will remain at said location for the duration <br /> of the Term of this Agreement. The District owns the Equipment.Participant agrees to provide the District, <br /> or a District contracted installer, with reasonable access to the equipment throughout the Term, and will <br /> provide the District,or a District contracted installer, with reasonable access to remove the equipment upon <br /> termination of this Agreement. <br /> D. RELEASE AND INDEMNIFICATION <br /> 1) The Participant agrees to defend, indemnify and hold harmless the District and its elected officials, <br /> officers,employees, agents,and other District service providers from and against any and all losses, <br /> Time of Day Pilot Customer Participant Agreement -- Execution Final_March 2,2020 2 of 7 <br />