My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2021
>
HDR Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:10:04 PM
Creation date
4/20/2020 1:09:01 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
9/30/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Port Gardner Storage Facility-Facilities Plan
Public Works WO Number
UT3728
Tracking Number
0002288
Total Compensation
$997,885.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FAR <br /> Consultant Services <br /> 1. Meet with City to review and discuss the existing InfoSWMM hydraulic model of the CSO <br /> system and separate stormwater network. Items for discussion include: <br /> a) Status of basin modeling upgrades. <br /> b) Model calibration/validation status. <br /> c) Flow monitoring data status/needs. <br /> d) Discussion of data file transfers and modeling tasks. <br /> 2. Prepare a Modeling Plan that will describe the modeling process/procedures that will be <br /> used. The Modeling Plan will describe the updates applied and the calibration/validation <br /> procedure and results. In addition, the Modeling Plan will include a summary of the <br /> assumptions made regarding the conveyance alternatives (as defined in Task 400). <br /> 3. Update the CSO and separate stormwater model to reflect: <br /> a) Sanitary flow loading: <br /> i. Current sanitary flow loads will be updated to reflect current flow loads observed <br /> in the combined system, including l&I assumptions identified through Tasks 202 <br /> and 301. <br /> ii. Future sanitary flow loads included in the model will be updated to be used in the <br /> evaluation of the future combined system performance scenarios. <br /> b) Current maintenance issues and operational procedures—modeled system will be <br /> reviewed and updated, as necessary, to include any recurring maintenance issues <br /> and reflect current operating procedures. <br /> c) Perform model validation/calibration using data collected in Task 301. The modeled <br /> response will be compared (validated) to measured values. If the model results do <br /> not fall within reasonable flow and volume ranges as compared with the observed <br /> system performance, then the model will be adjusted (calibrated) to better conform to <br /> existing system performance. <br /> 4. Use the updated hydraulic model to evaluate the existing CSO and separate stormwater <br /> systems (including the DWO) performance against level of service goals. This analysis <br /> will serve as a baseline against which to evaluate the impacts of alternatives identified <br /> under Task 400. <br /> 5. Perform quality control reviews periodically through the model update and <br /> calibration/validation process. <br /> Client Responsibilities <br /> 1. Provide existing CSO and separate stormwaer system model file. <br /> 2. Provide background system Geographic Information System (GIS) data and shapefiles. <br /> Data includes, but is not limited to, parcels, streets, water features, land use/zoning and <br /> contour. <br /> 3. Provide access to applicable sewer flow data. <br /> 4. Provide access to record drawings or other sewer system data needed to update the <br /> CSO system model. <br /> City of Everett—Port Gardner Storage Facility 5 Scope of Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.