My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Nelson/Nygaard Consulting Associates Inc. 4/2/2020
>
Contracts
>
6 Years Then Destroy
>
2020
>
Nelson/Nygaard Consulting Associates Inc. 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2020 1:19:35 PM
Creation date
4/20/2020 1:19:10 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Nelson/Nygaard Consulting Associates Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
12/31/2020
Department
Transportation Services
Department Project Manager
Paul Kaftanski
Subject / Project Title
Phase 2 Analysis
Tracking Number
0002289
Total Compensation
$165,544.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Work — Rethink Everett Transit Exhibit A <br /> introduction <br /> The administration and Council of the City of Everett have reached an initial conclusion that it is <br /> important to strive to meet the general goals of the Long Range Plan that Council adopted for Everett <br /> Transit in 2018. This is further underscored by the need to sustain Everett's corporate goals to continue <br /> to be an urban growth center for Snohomish County. To accomplish those directions, additional <br /> revenue, dedicated to transit, is a prerequisite. <br /> Since adoption of the Everett Transit Long Range Plan two alternative pathways have evolved. One <br /> pathway is to follow the outlines of the Long Range Plan "Growth Scenario". This would require that <br /> voters to increase the transit sales tax to 0.9%within Everett. (0.9% is the maximum allowable under <br /> current law.) The other pathway is to explore a consolidation and annexation of the City of Everett (for <br /> transit service provision) into the taxing and governmental boundaries of Community Transit. Under <br /> current law,this would ultimately have the effect of increasing the transit sales tax in Everett to 1.2%, <br /> doubling the present 0.6%sales tax. It is anticipated that Council will identify a preferred option and <br /> back up option by the end of 2020; direct staff to conduct an implementation and feasibility analysis in <br /> 2021; confirm or revise the preferred and back up options; and be in a position, if desirous,to ask voters <br /> if they are willing to support the preferred option as early as the first quarter of 2022. <br /> While the broad outlines of the two pathways are known there are myriad details necessary to <br /> understand before a well-informed decision by Council can be reached. This scope of work is designed <br /> to help the City collect, analyze, and assimilate that information. <br /> Task 1. Project Management <br /> Task Objectives: <br /> The central purpose of this task is to ensure the core project team stays in communication and on task <br /> through the project. The other objective is to ensure the project stays within the limits of the project <br /> budget and that project administration is maintained. <br /> Project Core team will be made up of representatives from the City of Everett, Everett Transit, <br /> Community Transit, Nelson\Nygaard and Envirolssues. <br /> Task 1.1 Core Team Meetings—The project core team will meet weekly, usually via phone call, <br /> throughout the life of the project. The project schedule is tight and requires this level of communication <br /> to ensure the project remains on course to complete on time. Of particular importance is the interface <br /> between the technical work and the outreach portion of the project. Each meeting will have an agenda <br /> and notes will be kept and distributed for those unable to attend. Nelson\Nygaard will be responsible <br /> for the agenda and the notes. <br /> Page 1 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.