My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 4/2/2020 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2021
>
Jacobs Engineering Group Inc. 4/2/2020 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 10:57:27 AM
Creation date
4/22/2020 10:57:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
12/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Force Main Condition Assessment/Redundancy
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001468
Total Compensation
$187,172.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Group 11/2/2018
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Jacobs will furnish structural designs for the concrete base including consideration <br /> for groundwater buoyancy. <br /> • Structural designs for the precast concrete walls, lid and access manholes will be <br /> furnished by the precast supplier. <br /> • This task is considered non-time critical and is therefore not on the same schedule as <br /> Subtasks 8.2, 8.3 and 8.4. The deliverables submitted for this task will separate <br /> deliverables, and not included in the bid-set package developed for Subtasks 8.2, 8.3 <br /> and 8.4. Due to a non-critical schedule,this task assumes the City will provide review <br /> comments within two weeks of draft submittals. <br /> Specific activities include: <br /> • Prepare 60% design plans and specifications, per Tables 3 and 4, and an Engineers <br /> opinion of construction costs. <br /> o City will provide one adjudicated set of review comments. <br /> o Jacobs will prepare an American Association of Cost Engineering (AACE) Class <br /> V Opinion of Probable Construction Costs (OPCC). <br /> • Prepare 100% bid-set documents, per Tables 3 and 4, draft cost estimate and <br /> responses to City review comments. <br /> • Prepare final bid-set documents, per Tables 3 and 4, final cost estimate and <br /> responses to City review comments. <br /> This task assumes no coordination meetings/review meetings are anticipated outside of the <br /> already scheduled bi-weekly PM meetings covered within Subtask 8.1. Refer to Table 2 for <br /> Jacobs schedule on a subtask level. <br /> Deliverables: <br /> • 60% design plans and specifications and draft cost estimate. <br /> • 100% bid-set documents, draft cost estimate and responses to City review <br /> comments. <br /> • Final bid-set documents, final cost estimate, responses to City review comments. <br /> Subtask 9.1 Construction Services <br /> During construction of the SEI to SRI alternative,the SRO8 Rehab Pipeline new Manhole, and <br /> the leaking hatch, per Subtasks 8.2, 8.3 and 8.4,Jacobs will provide construction support <br /> services and assist with submittal reviews and with answering contractor's questions. Jacobs <br /> will also attend the pre-construction meeting and conduct up to four (4) site visits during <br /> construction. <br /> This task assumes the following: <br /> Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.