My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 4/2/2020 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2021
>
Jacobs Engineering Group Inc. 4/2/2020 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 10:57:27 AM
Creation date
4/22/2020 10:57:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
12/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Force Main Condition Assessment/Redundancy
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001468
Total Compensation
$187,172.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Group 11/2/2018
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subtask 8.4 SRO8 Leaking Hatch - Final Design <br /> Utilizing the information obtained during Phase 1,Jacobs will continue with the design and <br /> development of construction documents and cost estimates of the leaking hatch replacement <br /> cover within the SR08 vault. Plans and specifications that will be submitted using the remaining <br /> budget in the contract (under Subtask 7.5) represent 90% design level. <br /> Specific activities include: <br /> • Prepare 100% bid-set documents (design plans and specifications), per Tables 3 and <br /> 4. (As stated above, only one bid-set package will be developed for this SOW.) <br /> • Prepare draft Engineers opinion of construction costs. The draft cost estimate will be <br /> submitted along with the 100% bid-set documents. <br /> • Prepare final bid-set documents, final cost estimate and responses to City review <br /> comments. <br /> This task assumes no coordination meetings/review meetings are anticipated outside of the <br /> already scheduled bi-weekly PM meetings covered within Subtask 8.1. Refer to Table 2 for <br /> Jacobs schedule on a subtask level. <br /> Deliverables: <br /> • 100% bid-set documents and draft cost estimate. <br /> • Final bid-set documents, final cost estimate and responses to City review comments. <br /> Subtask 8.5 Lift Station #1 Valve Vault - Predesign <br /> Jacobs will continue to advance the design services for a slab for their Lift Station #1 valve vault <br /> to support the Job Order Contract (JOC) project that will perform condition inspection of the <br /> forcemain pipe. Plans and specifications that will be submitted using the remaining budget in <br /> the contract (under Subtask 7.5) represent concept-level (-15%) design of the slab. This task <br /> assumes that the final deliverable will represent Final bid-set. <br /> This task assumes the following: <br /> • General vault layout and equipment data (dimensions and weight etc.) will be <br /> furnished by the JOC contractor (Forma). Vault construction is anticipated to be a <br /> reinforced cast-in-place base slab with precast concrete walls and lid in a "saddle" <br /> configuration. Note that no engineering stamp will be put onto these predesigns. <br /> Jacobs will refer to stamped calculations for development of the in-place base slab <br /> design. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.