Exhibit A-2 — Amendment 2 Scope of Work <br /> Task 8 and 9, Phase 2 - SEI to SRI Intertie, SR08 <br /> Manhole, Leaking Hatch and Lift Station Slab <br /> CH2M HILL Engineers, Inc. (Now Jacobs) agrees to furnish the City of Everett (City) the following <br /> services as Amendment 2 to the scope of work and in accordance with the terms and <br /> conditions of the agreement to provide engineering services in support of force main <br /> inspections effective November 2, 2018 (Agreement). The budget for this work is presented in <br /> Exhibit D. <br /> The subtask budget subtotals in Exhibit D identify Jacobs anticipated focus and level of effort; <br /> however,the subtask budget subtotals do not represent not-to-exceed budget limits. The <br /> overall budget total for this amendment of$187,172 shall be the not-to-exceed budget limit. <br /> Managing to the overall budget total shall be affected in recognition that some subtask budgets <br /> may be exceeded while others may be under-spent. Invoices shall be prepared and submitted <br /> on a monthly basis and configured so that labor and expenses costs are grouped and tracked at <br /> the subtask level (e.g. Subtask 8.1, Subtask 8.2, Subtask 8.3, etc.). <br /> The purpose of this project is to prepare plans, specifications and cost estimates for bidding and <br /> construction of the South End Interceptor (SEI) to Snohomish River Interceptor (SRI) Intertie <br /> (per Alternate 3A: A 36" SEI Connection Upstream of Collection System, with an SRI Connection <br /> on the West Side of SR08 Overflow Structure, as conducted in Phase 1) and a new Manhole <br /> structure on SR08 (per preliminary plans, conducted in Phase 1), as documented within the <br /> Final SEI to SRI Intertie Technical Memorandum and the Final SR08 Outfall Rehabilitation <br /> Technical Memorandum, both of which were submitted February 6, 2020. <br /> Since submittal of the Technical Memorandums, per request of the City,Jacobs has been <br /> advancing designs of the SEI to SRI Intertie,the new Manhole structure on SR08 and the SR08 <br /> leaking hatch using remaining available budget on the contract. Refer to the SOW developed <br /> for advancing these designs with remaining budget for a summary of the specific activities. <br /> Per the request of the City, the work described herein needs to be coordinated with the <br /> Riverfront Eclipse Mill Park site work during mid-2020. Subtask 8.2 includes the scope for <br /> developing the final design of the SEI to SRI Intertie. Subtask 8.3 includes the scope for <br /> developing the final design of the SR08 pipeline, including the new manhole structure. Subtask <br /> 8.4 includes the scope for developing the final design of the SR08 Leaking Hatch. The design <br /> and construction documents developed within Subtasks 8.2, 8.3 and 8.4 will be combined into <br /> one bid package. The cost estimates that will be developed at 100%, as noted within these <br /> subtask descriptions below, will also be combined into one cost estimate package. <br /> Page 1 <br />