My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 37 <br /> 2020 Biosolids Removal UT3705-11 <br /> tThe Owner will then add twenty-one(21)percent of the balance to cover Project overhead, general <br /> company Overhead,profit,and any other cost of supplying materials. <br /> To support charges for materials,the Contractor shall provide the Owner's Representative with authentic, <br /> complete and accurate copies of vendor invoices, including freight and express bills.If invoices are not <br /> available for materials from the Contractor stocks,the Contractor shall certify actual costs by affidavit. <br /> ' If Contract Claims for materials costs are too high,inappropriate,or unsupported by satisfactory <br /> evidence,the Owner's Representative may determine the cost for all or part of the materials.When <br /> determined in this manner,the cost will be the lowest current wholesale price from a source that can <br /> supply the required quantity, including delivery costs. <br /> The Owner reserves the right to provide materials. If so,the Contractor will receive no payment for any <br /> costs, Overhead,or profit on such materials. <br /> 9.6.3. Equipment. <br /> The equipment rates shall be actual cost but shall not exceed the rates set forth in the AGC/WSDOT <br /> ' Equipment Rental Agreement in effect at the time the Work is performed, <br /> The approval of the Owner's Representative shall be required for the selection of machine-power tools or <br /> equipment prior to their use in Force Account situations. <br /> The payment for any machine-power tools or equipment shall be made according to the current <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is authorized. The <br /> ' rates as set forth in the Rental Rate Blue Book(as modified by the current AGC/WSDOT Equipment <br /> Rental Agreement)are the maximum rates allowable for equipment of modem design and in good <br /> working condition. These rates shall be full compensation for all fuel,oil, lubrication,repairs, <br /> maintenance,and all other costs incidental to furnishing and operating the equipment except labor for <br /> operation. <br /> The Owner will add twenty-one(21)percent to equipment costs to cover Project Overhead, general <br /> company Overhead(excluding equipment Overhead included in the Rental Rate Blue Book),and profit. <br /> Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental Agreement will be <br /> maintained at each region office of the Washington State Department of Transportation and at each of the <br /> ' offices of the Associated General Contractors of America, in Seattle, Spokane, Tacoma,Washington and <br /> Wilsonville, Oregon,where they are available for inspection. <br /> 9.6.4. For Services. <br /> ' Compensation under Force Account for specialized services shall be made on the basis of an invoice from <br /> the providing entity. A"specialized service"shall be one that is typically billed through invoice in <br /> standard industry practice. Before Work is started,the Owner's Representative may require the <br /> ' Contractor to obtain multiple quotations for the service to be utilized and select the provider with prices <br /> and terms most advantageous to the Owner. In the event that prior quotations are not obtained and the <br /> service invoice is submitted by the Subcontractor,then after-the-fact quotations may be obtained by the <br /> ' Owner's Representative from the open market in the vicinity and the lowest such quotation may be used <br /> in place of the submitted invoice. <br /> Except as noted below,the Owner will pay the Contractor an additional twenty-one(21)percent of the <br /> ' sum of the costs included on invoices for specialized services to cover project Overhead, general <br /> company Overhead,profit,bonding, insurance,Business&Occupation tax,and other costs incurred. <br /> When a Supplier of services is compensated through invoice,but acts in the manner of Subcontractor, as <br /> described in 9.6.6.For Contractor Markup of Subcontractors Work of this provision,then markup for <br /> that invoice shall be according to 9.6.6.For Contractor Markup of Subcontractors Work. <br /> 1 <br /> 00 7200 - 37 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.