My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 38 ' <br /> 2020 Biosolids Removal UT3705-11 <br /> 9.6.5. For Mobilization. 1 <br /> Force Account mobilization is defined as the preparatory work performed by the Contractor including <br /> procurement, loading and transportation of tools and equipment, and personal travel time,when such <br /> travel time is a contractual obligation of the Contractor or a customary payment for the Contractor to all <br /> employees. Mobilization also includes the costs incurred during demobilization applies to both Force <br /> Account and other Contract Work. Owner will pay for mobilization for off-site preparatory work for <br /> Force Account items provided that Notice has been provided sufficiently in advance to allow the Owner's <br /> Representative to witness the activity, if desired. ' <br /> Any costs experienced during mobilization activities for labor, equipment,materials or services shall be 111 <br /> listed in that section of the Force Account summary and paid accordingly. <br /> 9.6.6. For Contractor Markup on Subcontractor's Work. <br /> When Work is performed on a Force Account basis by one or more approved Subcontractors,by lower- <br /> tier Subcontractors or Suppliers,or through invoice by firm(s)acting in the manner of a Subcontractor, <br /> the Contractor will be allowed an additional markup,from the table below, applied to the costs computed <br /> for Work done by each Subcontractor through 9.6.1,9.6.2, 9.6.3,and 9.6.4,to compensate for all <br /> administrative costs, including project Overhead,general company Overhead,profit,bonding, insurance, <br /> Business&Occupation tax, and any other costs incurred. <br /> A firm may be considered to be acting as a Subcontractor when the Owner's Representative observes one <br /> or more of the following characteristics: <br /> 1. The person in charge of the firm's activities takes an active role in managing the overall project, ' <br /> including extensive coordination, interpretation of Drawings, interaction with the Contracting <br /> Agency or management of a complex and interrelated operation. <br /> 2. Rented equipment is provided fueled, operated and maintained by the firm. Operators of rented ' <br /> equipment are supervised directly by the firm's representative. There is a little interaction <br /> between the Contractor and the employees of the firm. <br /> 3. The firm appears to be holding the risk of performance and quality of the Work. <br /> 4. The firm appears to be responsible for liability arising from the Work. <br /> Markups on Work Performed by Subcontractor(s): , <br /> On amounts paid for Work performed <br /> by each Subcontractor on each <br /> Force Account and calculated Up to$25,0000 12% <br /> through 9.6.1-4 <br /> On amounts greater than $25,000 up to $100,000 10% <br /> On amounts greater than $100,000 7% <br /> The amounts and markup rates shall be calculated separately for each Subcontractor on each Force <br /> Account item established. , <br /> The payments provided above shall be full payment for all Work done on a Force Account basis. The <br /> calculated payment shall cover all expenses of every nature,kind and description, including those listed 111 <br /> above and any others incurred on the Work being paid through Force Account. Nothing in this provision <br /> shall preclude the Contractor from seeking an extension of time or time-related damages to unchanged <br /> Work arising as a result of Force Account Work. The amount and costs of any work to be paid by Force <br /> Account shall be computed by the Owner's Representative and the result shall be fmal as provided in 3.2 <br /> OWNER'S REPRESENTATIVE. <br /> An item that has been bid at a unit price or lump sum in the Bid will not be paid as Force Account unless <br /> a change, as defined in ARTICLE 6. CHANGES,has occurred and the provisions require a payment <br /> adjustment. Items which are included in the Bid as Force Account or which are added by change order as <br /> 00 7200 - 38 GENERAL CONDITIONS ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.