My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2213 - 2 <br /> 2020 Biosolids Removal UT3705-11 <br /> 2. <br /> 3. Payment <br /> a. When 5% of the original Contract amount is earned from other bid <br /> items, 50% of the amount bid for Mobilization and Demobilization, or <br /> 5% of the original Contract amount, whichever is lesser, will be paid. <br /> b. Upon completion of work for the project, payment of the remaining <br /> amount bid for Mobilization and Demobilization will be paid. <br /> 1 <br /> B. Item #2 — DRY TONS REMOVED, DEWATERED AND PLACED ON <br /> BIOSOLIDS PAD (Unit Price) <br /> 1. For the purposes of this Contract the Contractor shall be paid the unit <br /> price bid for Dry Tons per the amount (by weight) of solids material that is <br /> weighed and transported from the dewatering staging area to the <br /> designated location on the City's Biosolids Pad. <br /> 2. For this contract, the measurement of a Dry Ton includes the weight of <br /> only the solid material contained in each ton of material that crosses the <br /> City owned scale —the weight of the water will not be included. <br /> 3. Contractor shall weigh biosolids by the truckload, using the certified scale <br /> provided by Owner. <br /> 4. The calculation of a Dry Ton for payment shall be as per the following <br /> equation: <br /> 5. <br /> (Tons of material loaded into a truck) x (Percent TS) <br /> 100 = Dry Tons <br /> Example 1 (Material at 28% TS): 111 <br /> 2 tons of material loaded into a truck x (28%) I <br /> 100 = 0.56 tons of Dry Ton <br /> material for payment. <br /> Example 2 (Material at 31% TS): <br /> 10 tons of material loaded into a truck x (31%) <br /> 100 = 3.1 tons of Dry Ton ' <br /> material for payment. <br /> 6. Payment <br /> a. All labor, equipment, materials and necessary appurtenances <br /> required to dredge the biosolids from the recirculation channel, and <br /> necessary to dewater these biosolids to a solids content of equal to <br /> or greater than 28% TS shall be incidental to the payment for each <br /> Dry Ton. <br /> b. Payment for labor, equipment, and materials necessary for loading, <br /> moving, weighing, transporting and depositing the material in the <br /> designated area on the City's Biosolids Pad shall also be incidental <br /> to the payment for each Dry Ton. <br /> 01 2213 - 2 UNIT PRICE MEASUREMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.