My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2213 - 1 <br /> 2020 Biosolids Removal UT3705-11 <br /> SECTION 01 2213 — MEASUREMENT AND PAYMENT <br /> 1.1 SUMMARY <br /> A. Unit price bid items measured in tons must be weighed and tested for solids <br /> content, and that information submitted to the Project Manager, prior to or <br /> iconcurrent with any application for payment. The minimum allowable solids <br /> content of any material loaded into a truck for weighing and transportation to the <br /> designated area on the Biosolids Pad shall be 28% Total Solids (TS). <br /> 1.2 REFERENCES <br /> A. Section 00 7200 — GENERAL CONDITIONS 1.1 DEFINITIONS OF WORDS <br /> AND TERMS: <br /> 1. DRY WEIGHT <br /> 2. DRY TON <br /> 3. WET WEIGHT <br /> 4. TOTAL SOLIDS <br /> B. Section 01 4523 — MATERIAL SAMPLING <br /> 1.3 BID ITEMS <br /> A. Item #1- MOBILIZATION AND DEMOBILIZATION (Lump Sum) <br /> 1. The lump sum price Mobilization and Demobilization shall be full <br /> compensation for the Work consisting of the preparatory Work and <br /> operations in mobilizing for beginning Work on the Contract, including, but <br /> not limited to, movement of those personnel, equipment, supplies and <br /> ' incidentals to the project site, preparation of submittals, and for the <br /> establishment of temporary offices, phone service, equipment and first aid <br /> supplies, field surveys, sanitation needs and all other facilities required by <br /> ' these specifications, and State and local laws and regulations. The costs <br /> of bonds, permits, and any required insurance, and any other <br /> preconstruction expense necessary for the start of the Work shall also be <br /> included. This Work also consists of the general project management of <br /> the Work including, but not limited to, field supervision and office <br /> management, as well as other incidental cost for management of the Work <br /> ' during the duration of the Contract. This lump sum price shall not exceed <br /> 5% of the total of all bid items. <br /> I <br /> 01 2213 - 1 UNIT PRICE MEASUREMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.