Laserfiche WebLink
City of Everett 01 2600 - 2 <br /> 2020 Biosolids Removal UT3705-11 <br /> 1.3 LUMP SUM MODIFICATION PROPOSALS <br /> A. The Owner may request priced proposals which either add or delete work prior ' <br /> to proceeding with any changes. <br /> B. When requested, the Contractor shall provide pricing per 1.01 C of this section 1 <br /> for review and approval by the Owner, prior to proceeding with the work. <br /> 1.4 CHANGE ORDERS <br /> A. A change order to the work will be issued including one or more Request for <br /> Change Proposals. The cumulative amount of adds and deducts along with the <br /> change in the number of days approved in each individual RFCP shall be added <br /> to or deducted from the Contract. The change order shall incorporate the RFCP ' <br /> forms, and all required back up documentation into a lump sum contract <br /> adjustment. <br /> B. The payment for work performed under the change order cannot be made until <br /> the change order has been signed and approved as per 007200-6. <br /> C. If an individual change order exceeds 10% of the original contract amount and is <br /> over $50,000, a special review may be required by the Owner. <br /> END OF SECTION 01 2600 <br /> 01 2600 - 2 CONTRACT MODIFICATION PROCEDURES <br />