My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 2600 - 2 <br /> 2020 Biosolids Removal UT3705-11 <br /> 1.3 LUMP SUM MODIFICATION PROPOSALS <br /> A. The Owner may request priced proposals which either add or delete work prior ' <br /> to proceeding with any changes. <br /> B. When requested, the Contractor shall provide pricing per 1.01 C of this section 1 <br /> for review and approval by the Owner, prior to proceeding with the work. <br /> 1.4 CHANGE ORDERS <br /> A. A change order to the work will be issued including one or more Request for <br /> Change Proposals. The cumulative amount of adds and deducts along with the <br /> change in the number of days approved in each individual RFCP shall be added <br /> to or deducted from the Contract. The change order shall incorporate the RFCP ' <br /> forms, and all required back up documentation into a lump sum contract <br /> adjustment. <br /> B. The payment for work performed under the change order cannot be made until <br /> the change order has been signed and approved as per 007200-6. <br /> C. If an individual change order exceeds 10% of the original contract amount and is <br /> over $50,000, a special review may be required by the Owner. <br /> END OF SECTION 01 2600 <br /> 01 2600 - 2 CONTRACT MODIFICATION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.