My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3216 - 1 <br /> 2020 Biosolids Removal UT3705-11 <br /> SECTION 01 3216 - CONSTRUCTION PROGRESS SCHEDULE <br /> 1.1 CONSTRUCTION SCHEDULE <br /> A. The Contractor shall prepare a construction schedule showing all tasks required <br /> to perform the work. Schedule shall show all tasks performed by all trades that <br /> is required to perform work within the contract time. The Schedule shall include <br /> sufficient time for cleaning, punch list review and completion of punch list items <br /> prior to the designated physical completion date. <br /> 1.2 FORMAT <br /> A. The Schedule shall be a critical path method Gantt chart style. <br /> B. The Schedule shall clearly identify all work and detailed to show specific steps to <br /> perform work. The relationship between the work items shall show the starting <br /> date, length of time required to perform work, completion of the work within the <br /> ' time frame shown. <br /> C. All work found on the schedule of values shall be clearly identified. Unless <br /> otherwise expressly authorized in writing by the City's representative, the <br /> Contractor must integrate the schedules with the Schedule of Values and unit <br /> price items so that each construction activity is represented by a dollar value. <br /> D. Submittals dates shall be included and the relationship between submittal and <br /> the work item shall be identified <br /> E. Materials requiring long lead times shall be clearly identified on the schedule. <br /> This shall include: <br /> ' 1. Date materials musts be ordered <br /> 2. Time for manufacturing <br /> 3. Time for delivery <br /> ' 4. Delivery date (expected date materials to be at the project) <br /> 5. Date of Installation <br /> ' 1.3 SUBMITTAL <br /> A. At the pre-construction meeting, a preliminary schedule is required to be <br /> submitted. Once the preliminary schedule has been approved, the schedule shall <br /> become the Project Schedule. The Project Schedule, as approved by the City, <br /> ' will be an integral part of the contract and will establish interim completion dates <br /> for the various activities under the contract. <br /> B. Schedule shall be submitted electronically. Acceptable format .mpp and pdf. <br /> 01 3216 - 1 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.