My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cityof Everett 01 2 - <br /> 3 16 2 <br /> 2020 Biosolids Removal UT3705-11 <br /> 111 <br /> C. Review by the City or City's Representative shall not constitute approval or <br /> acceptance of the Contractor's construction means, methods, sequencing, logic, <br /> order, precedence and succession of activities or Contractor's ability to complete <br /> the Work in a timely manner. <br /> D. The review/approval of any schedule shall not transfer any of the Contractor's ' <br /> responsibilities to the City. <br /> E. Subcontractors shall review all schedules prior to submittal. At the City's option 1 <br /> and sole discretion, City may require Contractor to obtain written acceptance of <br /> each schedule by subcontractors as practical and feasible, as the schedule <br /> relates to subcontractors' work. <br /> 1.4 UPDATES <br /> A. The Project Construction Schedule will be reviewed and updated at each <br /> progress meeting. All changes to the project schedule of more than three (3) <br /> working days shall be documented. The Schedule shall be updated to show <br /> measures required to bring project back on schedule. The Contractor alone shall <br /> remain responsible for adjusting forces, equipment, and work schedules to <br /> ensure completion of the work within the Contract Time. Any mistakes or errors <br /> in any schedule, including, but not limited to, mistakes or errors of logic, order, <br /> precedence, and duration, are and remain the Contractor's. 1 <br /> B. Should any activity not be completed by the stated scheduled date, the City will <br /> have the right to require the Contractor to expedite completion of the activity by <br /> whatever means appropriate and necessary, without additional compensation to <br /> the Contractor. <br /> C. The Schedule shall be used to justify time extension by <br /> days requested the <br /> q <br /> Contractor. For additional days requested, the Schedule shall be detailed <br /> enough to identify the work item(s) affected and the relationship to the changed <br /> or added work. <br /> D. Schedule shall be provided during the construction meetings. Schedule shall be <br /> on 11x17 papers and shall show current work progress. <br /> END OF SECTION 01 3216 <br /> 1 <br /> 01 3216 - 2 CONSTRUCTION PROGRESS SCHEDULE <br />
The URL can be used to link to this page
Your browser does not support the video tag.