My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3300 - 1 <br /> 2020 Biosolids Removal UT3705-11 <br /> SECTION 01 3300 - SUBMITTAL PROCEDURES <br /> 1.1 DESCRIPTION <br /> ' A. To ensure that the specified products are furnished and installed in accordance <br /> with the design intent, procedures have been established for advance submittal <br /> ' of design data and for its review by the City. <br /> B. Electronic submittals of shop drawings or other documents required for approval <br /> may be substituted for paper copies. Electronic submittals must be submitted <br /> utilizing current portable document format (PDF) software. All electronic <br /> submittals shall be certified documents and digitally signed showing Contractors <br /> ' review, and stamp showing approval of submittal. All electronic submittals shall <br /> be book-marked. A table of contents is required and shall be placed directly <br /> behind the cover page. Document properties shall include the Job Name, <br /> ' Division (Section Number), and items included in submittal. Prior to use of <br /> Electronic submittals, discuss with City, procedures and formatting including any <br /> ' additional contents to be included within the document. <br /> C. Related Work: <br /> 1. For individual submittals required, refer to the pertinent sections of these <br /> ' specifications. <br /> 2. Section 00 7200-2.4 <br /> 3. Make all submittals required by the Contract Documents, revise and <br /> ' resubmit as required to establish compliance with the specified <br /> requirements. <br /> 4. Wherever possible throughout the Contract Documents, the minimum <br /> acceptable quality of workmanship and materials has been defined by <br /> manufacturer's description of required attributes and performance. <br /> 1.2 PRODUCT HANDLING <br /> A. Make all submittals of shop drawings, samples, requests for substitution, and <br /> other similar items in strict accordance with the provisions of this section of the <br /> specifications. <br /> 1.3 IDENTIFICATION OF SUBMITTALS <br /> A. Consecutively number all submittals. Accompany each submittal with a letter of <br /> transmittal showing the transmittal number, date of transmittal, specifications <br /> ' section or drawing number to which the submittal pertains, brief description of the <br /> material submitted, and the company name of the originator of the submittal. <br /> I <br /> 01 3300 - 1 SUBMITTAL PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.