My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 3529 - 1 <br /> 2020 Biosolids Removal UT3705-11 <br /> SECTION 01 3529 - HEALTH AND SAFETY <br /> 1.1 SECTION INCLUDES <br /> ' A. This Section covers the requirements for compliance with health and safety <br /> precautions and controls for projects without hazardous waste operations. <br /> B. Safety plan. <br /> C. Protection of equipment, public and city staff. <br /> 1.2 REFERENCES <br /> A. General: The publications listed below form a part of these specifications to the <br /> ' extent referenced. The publications are referred to in the text by basic <br /> designations only. <br /> B. Code of Federal and State Regulations <br /> 1. OSHA General Industry Safety and Health Standards (29 CFR 1910), <br /> Publication V2206; OSHA Construction Industry Standards (29 CFR 1926.) <br /> ' 2. National Emission Standards for Hazardous Air Pollutants (40 CFR, part <br /> 61). <br /> 3. Washington State Department of Labor and Industries (WISHA) 49.17- <br /> ' 49.26 RCW <br /> 4. Washington Administration Code (WAC) 296-155 Safety Standards for <br /> Construction Work <br /> 1.3 SUBMITTALS <br /> ' A. The following submittals are required to be delivered within 5 days after Notice to <br /> Proceed has been received. <br /> 1. Health and Safety Plan (specific to this project) <br /> 2. Copies of all minutes/notes from daily safety meetings. <br /> 1.4 ACCIDENT REPORTING <br /> A. Serious accidents such as those resulting in treatment of an injury at a medical <br /> facility, response to the site by emergency medical personnel or damage to <br /> property other than that of the Contractor shall be reported to the Project Manager <br /> ' within twenty-four (24) hours of the occurrence. <br /> B. A copy of each accident report, which the Contractor or subcontractors have <br /> submitted to their insurance carriers, shall be forwarded to the Project Manager <br /> 01 3529 - 1 HEALTH AND SAFETY <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.