My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cityof Everett <br /> 01 3529 - 2 <br /> 2020 Biosolids Removal UT3705-11 <br /> as soon as possible, but in no event later than seven (7) calendar days after the <br /> accident occurred. , <br /> 1.5 PLAN <br /> A. The Contractor shall develop a Site-Specific Health and Safety Plan addressing <br /> health and safety management methods specific to the project. The Plan shall, <br /> at a minimum, include: <br /> 1. The name of the individual at the jobsite responsible for implementation and <br /> compliance with this Plan. <br /> 2. If work requires the use of Fall Restraint or Fall Arrest, a Fall Protection <br /> work plan meeting the requirements set forth in WAC 296-155-24505 shall <br /> be included. <br /> 3. If applicable, the Plan shall include the name and qualifications of any <br /> electrical safety observer to be provided by the Contractor. <br /> 4. Steps taken to provide Protection of the Public and City Employees. This <br /> includes protection from falling objects. Indicated type of overhead safe <br /> guards and protection to be installed and safeguards from equipment <br /> damage due to debris (including nails) on the ground. <br /> 5. A description of tasks to be undertaken, and equipment mobilized for this <br /> project. <br /> 6. A list of all known and expected safety or health hazards, problems, and <br /> proposed control mechanisms. <br /> 7. Safety Data Sheets (SDS) of and procedures for using, disposing of, or <br /> storing for all chemicals, products, or materials regulated by WAC 296-62 <br /> to be used by the Contractor. <br /> 8. A list of personal protective equipment, monitoring devices, and hazard- <br /> specific plans or permits as appropriate and required by State and Federal <br /> regulations. <br /> 9. A description of emergency response measures, equipment available for <br /> emergency response to address accidents and releases of materials, <br /> including, but not limited to, first aid, eye wash/showers, and fire <br /> extinguishing equipment, and location of this equipment at the jobsite. <br /> 10. Emergency phone numbers contacts, and location of the nearest medical <br /> facility. <br /> 11. A monitoring and inspection plan and record keeping measures to ensure <br /> that equipment and work practices comply with this Plan. <br /> 12. Personnel names, training and notification procedures as appropriate to <br /> ensure that all jobsite personnel are familiar with the Plan elements. Include <br /> copies of training certificates. <br /> 13. Procedures for safe storage and handling of flammable liquids, in <br /> accordance with WAC 296-24-330. <br /> 14. If applicable the Contractor shall include procedures for safe storage and I <br /> handling of compressed gasses in accordance with WAC 296-24-295, <br /> Compressed Gas General Requirement. <br /> 01 3529 - 2 HEALTH AND SAFETY <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.