Laserfiche WebLink
Cityof Everett <br /> 01 3529 - 2 <br /> 2020 Biosolids Removal UT3705-11 <br /> as soon as possible, but in no event later than seven (7) calendar days after the <br /> accident occurred. , <br /> 1.5 PLAN <br /> A. The Contractor shall develop a Site-Specific Health and Safety Plan addressing <br /> health and safety management methods specific to the project. The Plan shall, <br /> at a minimum, include: <br /> 1. The name of the individual at the jobsite responsible for implementation and <br /> compliance with this Plan. <br /> 2. If work requires the use of Fall Restraint or Fall Arrest, a Fall Protection <br /> work plan meeting the requirements set forth in WAC 296-155-24505 shall <br /> be included. <br /> 3. If applicable, the Plan shall include the name and qualifications of any <br /> electrical safety observer to be provided by the Contractor. <br /> 4. Steps taken to provide Protection of the Public and City Employees. This <br /> includes protection from falling objects. Indicated type of overhead safe <br /> guards and protection to be installed and safeguards from equipment <br /> damage due to debris (including nails) on the ground. <br /> 5. A description of tasks to be undertaken, and equipment mobilized for this <br /> project. <br /> 6. A list of all known and expected safety or health hazards, problems, and <br /> proposed control mechanisms. <br /> 7. Safety Data Sheets (SDS) of and procedures for using, disposing of, or <br /> storing for all chemicals, products, or materials regulated by WAC 296-62 <br /> to be used by the Contractor. <br /> 8. A list of personal protective equipment, monitoring devices, and hazard- <br /> specific plans or permits as appropriate and required by State and Federal <br /> regulations. <br /> 9. A description of emergency response measures, equipment available for <br /> emergency response to address accidents and releases of materials, <br /> including, but not limited to, first aid, eye wash/showers, and fire <br /> extinguishing equipment, and location of this equipment at the jobsite. <br /> 10. Emergency phone numbers contacts, and location of the nearest medical <br /> facility. <br /> 11. A monitoring and inspection plan and record keeping measures to ensure <br /> that equipment and work practices comply with this Plan. <br /> 12. Personnel names, training and notification procedures as appropriate to <br /> ensure that all jobsite personnel are familiar with the Plan elements. Include <br /> copies of training certificates. <br /> 13. Procedures for safe storage and handling of flammable liquids, in <br /> accordance with WAC 296-24-330. <br /> 14. If applicable the Contractor shall include procedures for safe storage and I <br /> handling of compressed gasses in accordance with WAC 296-24-295, <br /> Compressed Gas General Requirement. <br /> 01 3529 - 2 HEALTH AND SAFETY <br /> 1 <br />