My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Power Requirements <br /> Based upon the equipment set up APG will require 500 Ampere, 480 Volt, 60 Hz, <br /> three phase power in order to operate all centrifuges and auxiliary equipment. <br /> APG will use the power available at the site as stated in the bid documents. <br /> Water Requirements ' <br /> Polymer will be required to enhance the dewatering characteristics of the sludge <br /> to be processed. APG requires 200 gpm for polymer makedown water. APG will <br /> use the water lines provided at the setup area that were shown at the site visit. <br /> Schedule & Personnel On-Site ' <br /> APG plans to operate 15 hours per day on the weekdays and 10 hours per day on <br /> the Saturdays during the dewatering operation. There will be two 7.5-hour shifts <br /> each weekday and two 5-hour shifts on Saturdays. Each shift will consist of a <br /> dredge operator, polymer technician and centrifuge operator. The supervisor will <br /> be on site each day and available 24 hours. <br /> APG estimates the removal to require 22 -25 operating days to complete the <br /> removal. Four additional days will be needed to mobilize and demobilize <br /> Equipment Description for Project <br /> The following equipment will be provided and operated by American Process <br /> Group to execute the project. <br /> Two (2) Sharpies High G Centrifuges <br /> Two (2) Inhouse designed Electrical Distribution Buildings <br /> Two (2) Gorman Rupp Feed Pumps <br /> Two (2) Seepex Polymer Injection Pumps <br /> One (1) VMI 615 Dredge <br /> One (1) Inhouse built Polymer Make down System <br /> Two (2) Static In-Line Mixers <br /> Two (2) 3-inch Magnetic Flow meters <br /> Two (2) 2-inch Magnetic Flow meters <br /> One (1) Process Tank <br /> One (1) Screening Unit <br /> One (1) Fully Equipped Tool Crib <br /> One (1) Moisture Analyzer <br /> One (1) Centrate Return Pump <br /> Safety Equipment <br /> j1 -} City of Everett 2020 Biosolids Removal Project—Work Order/UT3705-11 March 6,2020 - Page 4 <br />