My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I • <br /> I <br /> ISchedule of Pricing <br /> See Bid Form <br /> I <br /> I • Proposal Terms, Taxes and Currency <br /> IThis quotation is in US Dollars and does not include any local taxes or fees. <br /> I <br /> Project References <br /> I Everett Water Pollution Control Facility Biosolids Removal Project <br /> Everett, WA <br /> Dates: 2017, 2016, 2013, 2010, 2008 <br /> I Contract Value: <br /> • 2019: 2,000 dry tons <br /> • 2017: 2,144 dry tons <br /> I • 2016: 2,073 dry tons <br /> • 2013: 2,743 dry tons <br /> • 2010: 4,265 dry tons <br /> I • 2008: 4,038 dry tons <br /> These projects were to dredge and dewater the biosolids from the various cells <br /> at the Everett WPCF to a minimum 28% solids consistency. APG dewatered and <br /> Istockpiled the material so the hauling contractor could take the material the <br /> landfill transfer station. The projects were completed within in their scheduled <br /> Itime frames. <br /> Contact: Mr. John Nottingham <br /> I City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> I <br /> I <br /> ,' City of Everett 2020 Biosolids Removal Project-Work Order#UT 3705-11 March 6,2020 Page S <br /> a 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.