My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 5213 - 1 <br /> 2020 Biosolids Removal UT3705-11 <br /> SECTION 00 5213 - AGREEMENT FORM <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this day of ORCN , by <br /> and between the City of Everett, Washington, a municipal corporation existing under the <br /> laws of the State of Washington, hereinafter called the "City," and <br /> nOt..CZ\CM. PRoC.e-SS Cs( r, it-1 C. , hereinafter called the "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br /> agrees to furnish all labor, tools, materials, equipment, and supplies required to build and <br /> construct and to build and construct in a workmanlike manner the Work, improvements, <br /> and appurtenances in accordance with the Specifications and Drawings entitled: "2020 <br /> ' Biosolids Removal", (the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are <br /> incorporated by reference and are hereby made a part of this Contract: <br /> A. Notice to Bidders (Advertisement for Bids) <br /> B. Instructions to Bidders <br /> C. General Conditions <br /> D. Supplementary Conditions (if any) <br /> E. Drawings, Standard Plans, and Specifications <br /> F. Addenda (if any) <br /> G. Payment and Performance Bonds <br /> H. Contractor's Bid Form <br /> I. Other documents described as Contract Documents in Section 072000, <br /> General Conditions <br /> J. All provisions required by law whether set forth and reproduced herein or not <br /> Terms that are capitalized in a Contract Document but not defined in that Contract <br /> Document shall have the meaning defined to them in the other Contract Documents. <br /> 2. Contract Time. Substantial Completion of the Work shall be achieved within <br /> Ninety (90) calendar days after the effective date of the Notice to Proceed. Physical <br /> Completion shall be within Thirty (30) calendar days after the actual date of issuance of <br /> substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put <br /> to additional expense in the event that the Contractor does not complete the Work in all <br /> respects and have it ready for use by the Substantial and Physical Completion dates <br /> 00 5213 - 1 AGREEMENT FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.