Laserfiche WebLink
I-aZ <br /> Deliverables <br /> 1. Draft version of the Outfall Pipeline Inspection and Repair Assessment TM to be provided <br /> electronically via PDF. <br /> 2. Final version of the Outfall Pipeline Inspection and Repair Assessment TM to be provided <br /> electronically via PDF. <br /> Schedule <br /> Inspection and repair to be performed during the dry season when the outfall pipeline can be <br /> temporarily removed from service. The contract to be extended to December 31, 2020. <br /> Fee <br /> HDR and the City agree to discuss potential fees for the associated scope and payment of <br /> inspection and repair costs upon determination of the cause of the leak. <br /> City of Everett—WPCF FEN Amendment No.4 3 Scope of Services <br />