My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3105 PINE ST DELTA HOTEL 2020-05-04
>
Address Records
>
PINE ST
>
3105
>
DELTA HOTEL
>
3105 PINE ST DELTA HOTEL 2020-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:37:07 AM
Creation date
5/4/2020 11:28:11 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3105
Tenant Name
DELTA HOTEL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.77. PROJECT RANG FROM DEVELOPMEN I +ZCHNICIAN <br /> k/(Public Works / Permit Services) <br /> Routed Date: 1/30/2018 <br /> Permit#: PW1801-052 <br /> PROJECT ADDRESS: 3105 PINE ST (Delta Hotel) Me. 4,i; 2126//g0m) <br /> DESCRIPTION OF WORK: SITE WORK FOR HOTEL RENOVATION : Project to include localized parking lot reconfigurations. <br /> Additionally,within the right of way, approx 200LF of frontage improvmements along Pine Street.These improvements will consist of <br /> acurb bump-out,a new curb ramp, and a new driveway for access to the hotel porte cochere. _( <br /> PLANNING REFERENCE#'s(if applicable): 52 <br /> PRE-APP MEETING #: /,-- gisitnafi <br /> LAND USE PROJECT#: ,Q <br /> PUBLIC WORKS REVIEWER: Scx,bvl)1& .)6 ,rr <br /> REQUEST: Please review the attached material for your area of concern and return any comments <br /> and/or redlines to the Public Works Reviewer listed above. <br /> ROUTED TO: flEQcS`E. Ck a <br /> o Stormwater/Drainage: Jane Zimmerman/Arnie Roshak/Erik Emerson G�ll �x��/(,%rC <br /> C Traffic MichaelBric John Wisdom/ Corey Hert/Steve Sawyer/Tim Miller / `�'�" on <br /> ` L 1G �r 11? <br /> ❑ Water: Jim Spooner/Tim Markham/ Rich Hefti/Shane Cavanah �' eV, 7fy M1€_. <br /> 27670 <br /> ❑ Sewer: Brian Doolan/Dave Voigt/Arnie Roshak/ Mark Sadler / ' 'ease/'ltdi'F�[ aC.i4' 4e. ��4 <br /> ❑ Planning: Teresa Weldon/Grace Pollard/Kelsey Heyd/Kembra Landry/ Dave Tyler/John Jimerson/Steve Ingalsbe <br /> ❑ Building: Drew Martin/James Bronder/Jeff Heilman/Tony Lee <br /> ❑ Fire: Jim Venturo/ Bill Armstrong/Chad Harris/Other <br /> ROUTED MATERIALS: <br /> la Plans 0 Original City Comment Letter <br /> ❑ Traffic Control Plan 0 Original City Plan Markups <br /> ❑ Drainage Report 0 Original City Drainage Report Markups <br /> ❑ Geotechnical Report 0 SEPA Determination (for reference) <br /> ❑ Wetland Report 0 Preliminary Short Plat Approval (for reference) <br /> ❑ Arborist Report 0 Other: <br /> COMMENTS FROM REVIEWER: (Please make comments below and/or redlines on plans) <br /> STATUS: <br /> Approved <br /> Approved as Noted/Modified <br /> i!‘ <br /> ❑ Revisions Required, See Comments <br /> ❑ Review Not <br /> /Y O/R/equired j <br /> COMMENTS: /.�s�� a� 4arl� a S Slojvu'4 //1 <br /> REVISED 12/07/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.